BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Garland, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

LOCATION OF PROJECT E. Woodbury Drive (S. First Street - 114 E. Woodbury Drive) Ticonderoga Drive (Spindrift Passage - Windward Passage) Quail Drive (S. Country Club Road - High Meadow Drive) All portions of the construction project are located within the corporate limits of Garland, Texas Remove and replace existing 6" clay wastewater main with 2,454 linear feet of 8" PVC wastewater main, existing 6" cast iron water main with 3,284 linear feet of 8" PVC water main, existing concrete street, driveway, and sidewalk pavement (14,222 square yard), and all incidentals as shown on the approved plans. A copy of the prospective vendors Bid Bond in the amount not less than five percent (5%) of the maximum bid price payable with recourse to the City of Garland, from a reliable surety company as a guarantee that the bidder will enter into a contract and execute the Performance Bond, Payment Bond and Maintenance Bond within ten (10) days after notice of award of contract, should be uploaded with this bid. A Payment and Performance Bond is being requested for this project. Sec. 2253.021.(1) & (2) of the Local Government Code states that all public works contract in excess of $50,000.00 require a Payment Bond and all public works contracts above $100,000.00 require a Performance Bond. Payment and Performance bonding will be for 100% of the total awarded contract Question Deadline 10/29/2024 at 5:00 PM CT A Maintenance Bond is being requested for this project. This ensures the Contractor will maintain and keep in good repair all work to be performed and done under the Contract for a period of one (1) year from the date of acceptance of the completed work by the City. Maintenance Bonding will be for 10% of the total awarded contract

Post-Bid

Sidewalks / Parking Lot

$2,700,000.00

Public - City

Paving, Site Work

60

11

23

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
68
Bidding Soon
3,621
All Active Projects
1,508
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 30, 2024

img_map_placeholder

Multiple Locations, Garland, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.