BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Parker, Florida. Completed plans call for site work for a water / sewer project.

Questions Due Date: Wednesday, August 7, 2024 (5:00 p.m. CST) The CDBG-DR Sewer Lining and Rain Pan Installation project will consist of cleaning, repairing and installation of cured-in-place lining (CIPP) of 144 manholes (approximately 1008 vertical feet), installation of 144 rain pans, bypass pumping, and CIPP lining of 44.10 vertical feet of wet wells in three lift stations (P-10, P-11, and P-15) located within the northwest quadrant of Parker, specifically north of Business Highway 98, east of Martin Lake, south of Cherry Street, and west of U.S. Highway 22A, Parker, Florida. This project includes CCTV inspection prior to and following lining activities, as shown on the Construction Drawings within the Parker community. The City of Parker hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. The City of Parker is an Equal Opportunity Employer. We encourage all small and minority owned firms and womens business enterprises to participate. A bid bond or certified check, certified check, or other negotiable instrument for five percent (5%) of the total bid amount must accompany each bid prior the Bid Opening. The successful bidder will be required to furnish a performance bond in the amount of his bid and shall, before entering on the work of said contract, be licensed as a contractor of the City of Parker. The owner reserves the right to waive any informalities or to reject any or all bids. The Agreement will include a stipulation that the work be Substantially Complete within 120 calendar days following receipt of the Notice to Proceed and achieve final completion within 30 days thereafter.

Bid Results

Water / Sewer

$431,010.00

Public - City

Site Work

11

8

23

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
14
Bidding Soon
295
All Active Projects
137
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

October 17, 2024

img_map_placeholder

Multiple Locations, Parker, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.