BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2024 at 8:00 PM

Updated August 1, 2024

Site work and paving for a civil project in Prescott, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Yavapai-Prescott Indian Tribe (YPIT / Owner) is requesting proposals from qualified Contractors (Arizona Licensed and Insured) to provide construction services for asphalt paving services for the "Target Entrance" in the Frontier Village Shopping Center. "Target Entrance" Remove existing asphalt from the lighted entrance into FVC (Target) after ADOT Hwy 69 right of way between Applebee's and Golden Corral to the top of slope where pavers begin. Include separate cost for potential concrete curb replacement at edge of pavers, top of slope. Remove any bad substrate where needed and install and compact 6" ABC. Repave with 4" MAG asphalt over aggregate base, while maintaining existing drainage. Stripe as shown on the exhibit. Include traffic control plan and separate line item for work to be performed in the evening, or after hours. Refer to the attached 8.5"x11" drawings to identify the following areas of work. All proposals will become the property of the Owner, Yavapai-Prescott Indian Tribe (YPIT). Selection will be made based upon a combination of qualifications and price. YPIT is not responsible for costs incurred by respondents for preparing proposals. Decisions made by YPIT are final.

Post-Bid

Roads / Highways

$1,000,000.00

Public - Federal

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
19
Bidding Soon
635
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

September 2, 2024

Project location map

Multiple Locations, Prescott, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.