BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Compton, California. Completed plans call for the renovation of a educational facility.

RFQ CCC 083 ADMINISTRATION BLDG HVAC & ROOFING REPLACEMENT NOTICE IS HEREBY GIVEN that the above-named California Community College District, through its Board of Trustees ( the District ) will accept Bid Proposals for the Contract for ADMINISTRATION BLDG HVAC & ROOFING REPLACEMENT ( the Work ). Submittal of Bid Proposals . All Bid Proposals shall be submitted on forms furnished by the District at or prior to the date and time set forth above. As of July 22, 2024, a construction manager has been selected for this project. A firm construction timeline for this project has not yet been released. The project has been postponed until at least the summer of 2025 While the Bid and Contract Documents may be available through other Plan rooms or sites, the District does not guarantee the authenticity or completeness of the Bid and Contract Documents obtained from such other Plan rooms or sites. Bidders shall be solely responsible for reviewing the District s website and downloading any and all Project Documents and Addenda prior to bidding. Documents Accompanying Bid Proposal . Each Bid Proposal shall be accompanied by: (i) the required Bid Security; (ii) Subcontractors List; (iii) Non-Collusion Affidavit; (iv) Statement of Bidder s Qualifications; and (v) Verification of Contractor and Subcontractor DIR Registration. Prevailing Wage Rates . Pursuant to California Labor Code 1773, the Director of the Department of Industrial Relations of the State of California has determined the generally prevailing rates of wages in the locality in which the Work is to be performed. Bidder and Subcontractors DIR Registered Contractor Status . Pursuant to and in accordance with Labor Code 1771.1, each Bidder must be a DIR Registered Contractor when submitting a Bid Proposal. The Bid Proposal of a Bidder who is not a DIR Registered Contractor when the Bid Proposal is submitted will be rejected for non-responsiveness. All Subcontractors identified in a Bidder s Subcontractors List must be DIR Registered contractors at the time the Bid Proposal is submitted. Contractors License Classification . The District requires that Bidders possess the following classification(s) of California Contractors License at the time that the Contract for the Work is awarded - B - General Building. The Bid Proposal of a Bidder who does not possess a valid and in good standing Contractors License in the classification(s) set forth above will be rejected for non-responsiveness. Any Bidder not duly and properly licensed is subject to all penalties imposed by law. No payment shall be made for the Work unless and until the Registrar of Contractors verifies to the District that the Bidder awarded the Contract is properly and duly licensed for the Work. Contract Time . Substantial Completion of the Work shall be achieved as set forth in the Contract Documents; Liquidated Damages will be assessed for delayed Substantial Completion. Bid Security . Each Bid Proposal shall be accompanied by Bid Security in an amount not less than ten percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s). A Bid Proposal not accompanied by the required Bid Security is non-responsive and will be rejected by the District. Alternate Bid Items . If the bidding include(s) Alternate Bid Items for which each Bidder must propose pricing for each Alternate Bid Item, the District s selection of Alternate Bid Items for determination of the lowest bid shall be as set forth in the Instructions to Bidders. No Withdrawal of Bid Proposals . Bid Proposals shall not be withdrawn by any Bidder for sixty (60) days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted in their respective Bid Proposals. Pre-Bid Inquiries . Bidders may submit pre-bid inquiries or clarification requests no later than Monday, July 22, 2024 @ 2:00PM. Pre-bid inquiries or clarification requests shall be submitted only to Carol Kober at: ckober@pcm3.com Do not submit pre-bid inquiries direct to the District. Copies of Agreement and Bonds . The number of required executed copies of the Agreement are THREE (3) The number of required executed copies of the Performance Bond and the Labor & Materials Payment are THREE (3). Award of Contract; Waiver of Irregularities . The Contract, if awarded, will be by action of the District's Board of Trustees to the responsible Bidder submitting the lowest priced responsive Bid Proposal. If Alternate Bid Items are included in the bidding, the lowest priced Bid Proposal will be determined on the basis of the Base Bid Proposal or on the Base Bid Proposal and the combination of Alternate Bid Items selected in accordance with the above. The District reserves the right to reject any or all Bid Proposals or to waive any irregularities or informalities in any Bid Proposal or in the bidding.

Post-Bid

Educational

$1,200,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
527
Active Projects
234
Bidding Soon
3,778
All Active Projects
1,674
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 1, 2024

September 8, 2025

img_map_placeholder

1111 E Artesia Blvd, Compton, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.