EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 1, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Middletown, Connecticut. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Question Deadline 08/07/2024 All Project Questions, Bid Questions, and Pre-Bid Equals and Substitution Requests must be submitted fourteen (14) Calendar Days prior to the Bid Due Date.All Project Questions and Pre-Bid Equals and Substitution Requests must be emailed (not phoned) to the Architect/Engineer with a copy to the Construction Administrator and the Project Manager listed below. Architect/Engineer: DMHAS Email: Gregory.cross@ct.gov Construction Administrator: DMHAS Engineering Email: Gregory.cross@ct.gov Project Manager: Gregory Cross Email: Gregory.cross@ct.gov All Bid Questions must be emailed to the Procurement Unit listed below. Procurement Unit: Mikako Tirone Email: MikakoFabiano.Tirone@ct.gov BIDDING LIMITED TO: Current DAS-Certified SBE/MBE Set-Aside Contractors Only Project Location: Connecticut Valley Hospital, Middletown, CT 06457 Estimated Construction Costs: Less Than or Equal To $1,000,000 Cost Estimate Range: $ 350,000 To $ 600,000 Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% If prevailing wages are required on this project, they shall be in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to C.G.S.& 31-53 (a) through (h), as amended. Liquidated Damages: $ 100.00 Per Calendar Day Beyond Substantial Completion. $ 500.00 Per Calendar Day Beyond 90 days After Substantial Completion. Contract Time Allowed: Calendar Days: 60 The Awarding Authority reserves the right to do any of the following without liability, including but not limited to: (a) waive technical defects in the bid proposal as he or she deems best for the interest of the State; (b) negotiate with a contractor in accordance with Connecticut General Statutes Section 4b-91; (c) reject any or all bids; (d) cancel the award or execution of any contract prior to the issuance of the "Notice To Proceed"; and (e) advertise for new bids. ***Question notes: Architect/Engineer: DMHAS Email: Gregory.cross@ct.gov Construction Administrator: DMHAS Engineering Email: Gregory.cross@ct.gov Project Manager: Gregory Cross Email: Gregory.cross@ct.gov All Bid Questions must be emailed to the Procurement Unit listed below. Procurement Unit: Mikako Tirone Email: MikakoFabiano.Tirone@ct.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$358,661.00

Public - State/Provincial

Paving, Site Work

3

23

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Progress Payment Procedures, Administrative Requirements, Construction Progress Documentation, Network Analysis Schedules, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Roads, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Metal Lath, Tiling, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Other Specialties, Pest Control Devices, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Mowing, Pruning, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Site Improvements, Fences and Gates, Retaining Walls, Irrigation, Planting Irrigation, Drip Irrigation, Planting, Planting Preparation, Soil Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Hooks, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Backhoes
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
576
Active Projects
345
Bidding Soon
4,862
All Active Projects
2,250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2024

September 20, 2024

img_map_placeholder

1000 Silver St, Middletown, CT

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Paving Replacement Grounds Drive Middletown Campus DMHAS

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.