BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bellevue, Washington. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and bridge / tunnel.

From NE 12th St to Northup Way; widen to 5 lanes, w/ 2 travel lanes in each direction w/ turn pockets or a center turn lane, traffic signals, curb, gutter, sidewalks and bike facilities or multi-use paths on both sides, redesign and replacement of existing electric power transmission line towers. There are no bicycle facilities or multi-purpose paths between Ichigo Way and Northup Way. Segment btwn NE Spring Blvd and Ichigo Way will be designed and constructed in coordination with Sound Transit and will have a bridge structure over the East Link lightrail line project in this vicinity. The project will likely be constructed in stages: NE Spring Blvd to Ichigo Way; redesign and replacement of 2 electric power transmission line towers along the west project frontage; NE 12th St to NE Spring Blvd; and Ichigo Way to Northup Way (w/ a non-motorized facility on the west side btwn NE 16th St and Ichigo Way). This is a multi-year project; programmed amounts are funds available within 2019-202 Length : 1.100 County: King Agency: Bellevue Begin Termini : Northup Way End Termini : NE 12th Street As of July 18, 2024, the project is in Final Planning status. Anticipated letting year is 2024. WADOT - 124th Avenue NE Improvement Project *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$89,695,241.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
31
Bidding Soon
880
All Active Projects
370
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

img_map_placeholder

124th Ave SE, Bellevue, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.