Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Bellevue, Washington. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and bridge / tunnel.
From NE 12th St to Northup Way; widen to 5 lanes, w/ 2 travel lanes in each direction w/ turn pockets or a center turn lane, traffic signals, curb, gutter, sidewalks and bike facilities or multi-use paths on both sides, redesign and replacement of existing electric power transmission line towers. There are no bicycle facilities or multi-purpose paths between Ichigo Way and Northup Way. Segment btwn NE Spring Blvd and Ichigo Way will be designed and constructed in coordination with Sound Transit and will have a bridge structure over the East Link lightrail line project in this vicinity. The project will likely be constructed in stages: NE Spring Blvd to Ichigo Way; redesign and replacement of 2 electric power transmission line towers along the west project frontage; NE 12th St to NE Spring Blvd; and Ichigo Way to Northup Way (w/ a non-motorized facility on the west side btwn NE 16th St and Ichigo Way). This is a multi-year project; programmed amounts are funds available within 2019-202 Length : 1.100 County: King Agency: Bellevue Begin Termini : Northup Way End Termini : NE 12th Street As of July 18, 2024, the project is in Final Planning status. Anticipated letting year is 2024. WADOT - 124th Avenue NE Improvement Project *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Roads / Highways
$89,695,241.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2024
124th Ave SE, Bellevue, WA
Related To This Project
Bellevue, WA
Bid Date: Aug 01 2024
Bellevue, WA
Bid Date: Aug 14 2024
Bellevue, WA
Bid Date: Aug 14 2024
Bellevue, WA
--
Bellevue, WA
--
Bellevue, WA
Bid Date: Aug 02 2024
Bellevue, WA
--
Bellevue, WA
Bid Date: Apr 01 2021
Bellevue, WA
Bid Date: Aug 08 2024
Bellevue, WA
Bid Date: Jul 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.