BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Valencia, New Mexico. Completed plans call for site work for a water / sewer project.

The Middle Rio Grande Conservancy District (MRGCD, District) is pursuing automation of an outfall (infrastructure that returns water to the river from agricultural facilities) at the terminus of the Peralta Main Canal in Valencia County, NM. The contract will be formally awarded the week of July 30th, 2024 If Contractor has, or grows to, six (6) or more employees who work, or who are expected to work, an average of at least 20 hours per week over a six (6) month period during the term of the contract The District reserves the right to reject any and all bids, to waive any informality in bids and, unless otherwise specified by the bidder, *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. The Peralta Outfall Automatic Control Gates Project involves the modification of the existing concrete structure to facilitate the installation of an automated undershot water control gate. The project is located to the west of NM-47 and south of Calle Del Rio Road, adjacent to the Peralta Main Canal leading towards the River. These gates will provide the ability to adjust and measure water flow to meet the operational needs of the Peralta Main Canal and the Riverside Drain. The Contractor will install and modify the concrete structure to accommodate max flow rate of 170 cubic feet per sec (cfs) with a 10’ width x 6.5’ height dimension in the existing concrete structure.

Award

Water / Sewer

$74,381.00

Public - City

Site Work

3

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
14
Bidding Soon
311
All Active Projects
128
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 30, 2024

August 29, 2024

img_map_placeholder

To Be Determined, Valencia, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.