EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a transportation facility in Albany, New York. Completed plans call for site work for a transportation facility.

Reference Number ;0000357980 This Project Includes the Removal and Replacement of the Existing Passenger Boarding Bridges a-6 And B-6. Question Deadline 08/08/2024 at 12:00 PM ET Questions are submitted online : No. No Bid Shall Be Considered Unless the Organization Making the Bid Has First Obtained a Copy of the Ifb. In Accordance With State Finance Law 139-j and 139- K, This Solicitation Includes and Imposes Certain Restrictions on Communications Between the Airport Authority and an Offerer/bidder During the Procurement Process. Is Restricted From Making Contacts From the Earliest Notice of Intent To Solicit Offers by This Solicitation Through Final Award and Approval Of the Procurement Contract by the Authority ("restricted Period") To Other Than Designated Staff Unless It is a Contact That is Included Among Certain Statutory Exceptions Set Forth in State Finance Law 139-j(3)(a). Certain Findings Of Non-responsibility Can Result in Rejection for Contract Award and In the Event of Two Findings Within a 4 Year Period the Offerer/bidder Is Debarred From Obtaining Governmental Procurement Contracts. MWBE /SDVOB Responses Are Encouraged. The Work will be substantially completed within 180 days after the Notice to Proceed in accordance with paragraph 6.12, and completed and ready for final payment within 210 days after the Notice to Proceed. Extensions of Contract Time are available pursuant to the provisions of Article 17.

Award

Transportation Terminals

$2,230,000.00

Public - County

Site Work

12

12

9

8

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Mockups, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Storm Water Pollution Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Flooring, Wood Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Construction and Equipment, Transportation Equipment, Passenger Loading Bridges
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
139
Bidding Soon
1,601
All Active Projects
751
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

October 14, 2024

img_map_placeholder

22 Jetway Dr, Albany, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Passenger Boarding Bridge Improvements; Replace A-6 & B-6

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.