BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Boise, Idaho. Completed plans call for site work for a bridge / tunnel.

The Government intends to issue one FFP award for construction services, Lime Creek Replacement Trail, IAW with SOW, Specs & all attachments. The work shall consist of but is not limited to mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable trail bridge, rip rap armoring of new bridge abutments using local in-situ rock, design, purchase, transport, and installation of a prefabricated steel trail bridge, design, purchase, transport, and installation of new substructure (pre-cast concrete grade beams), construction of approach embankments, and general cleanup. MAGNITUDE OF CONSTRUCTION PROJECT : $100, 000 - $250,000 PROJECT LOCATION The project is located is approximately 0.8 miles northwest along the Slickear Trail (#193001) from its junction with the termination of National Forest System Road (NFSR) #181A in T1N, R11E, Section 18, Mountain Home Ranger District, Boise National Forest, Idaho. Detailed travel directions to the project location are included in the plans. PERFORMANCE: Specific time windows for work have been established to protect aquatic species and hydrologic function. All instream work shall be accomplished between 30 August and September 15th, 2024, or 2025. Winter shutdown will occur from November 1st, 2024, through May 1st, 2025 Please review all documents attached, all questions and clarification pursuant to this RFQ must be received electronically by Contracting Officer on or before 24 July 2024, 2:00, P.M., CDT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PERFORMANCE: Specific time windows for work have been established to protect aquatic species and hydrologic function. All instream work shall be accomplished between 30 August and September 15th, 2024, or July 01, 2025, and September 15, 2025

Post-Bid

Bridges / Tunnels

$250,000.00

Public - Federal

Site Work

7

7

9

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
176
All Active Projects
59
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.