Renovation of a military facility in Bayview, Idaho. Completed plans call for the renovation of a military facility.
The Naval Surface Warfare Center, Carderock Division (NSWCCD) Acoustic Research Detachment (ARD) at Bayview, Idaho has a requirement to replace the control system on the Building 200 HVAC system. The work to be completed consists of furnishing all necessary supervision, transportation, labor, tools, supplies, equipment required to remove and replace the existing Carrier Comfort Network Controller in Building 200 with a like in kind replacement system. General Description: Propose to install new commercial off the shelf HVAC Control system Shall provide a new on-site PC workstation with full system control Design and install a software graphical package with a floorplan for zone identification. Design and provide an alarm notification system. Replace zone thermostats with compatible COTS units. Provide air balancing to all VAV zones. Provide linkage to chillers for full control Provide start and stop control to heating and cooling pumps Incorporate control of snow melt system Start-up of control system with air balancing per original drawing specifications Provide training to ARD personnel in the maintenance, troubleshooting, and operation of the new control system. Manufactures standard warranty and one-year parts and labor warranty. 3.0 Applicable Documents Standard Original Equipment Manufacturer warranty, maintenance and operation documentation. 4.0 Place of Performance The contractor shall perform the work at the following location: NSWCD ARD Bayview 33964 N Main Avenue Building 200 Bayview, ID 83803 5.0 Tasks The contractor shall provide all transportation, labor, materials and supervision to perform the following tasks: 5.1 Contractor shall install new control work station and controllers in a manner that does not impede on base operations by ensuring cooling in server rooms is maintained thought all phases of work. 5.2 Contractors shall provide a "nonproprietary" control system that can be serviced by non-affiliated service technicians. 5.3 Contractors shall install new control cabinets and install conduit for all control wires and power supply cables that are ran in the mechanical room. 5.4 Contractors shall install control and status sensors to hot water pumps and motors, chill water pumps and motors, snow melt pump and motor, chillers, boilers, and air handler units. 5.5 Contractor shall replace/install outdoor air temperature sensors, freeze protection sensors, air filter differential pressure transducers. 5.6 Contractor shall replace/install intake and exhaust louver controller as well as status. 5.7 Contractors shall replace a total of thirty nine VAV controllers with new universal COTS controllers, room sensor, temperature probes, flow sensors, and damper control. 5.8 Contractors shall replace the hot water strainers and shut off valves and update with COTS hose and valve kits. 5.9 Contractors shall test the glycol cooling loop for leaks and recycle the glycol system to 40% concentration using the government furnished glycol supply. 5.10 Contractors shall test the heating loop for leaks and recycle the corrosion inhibitor the appropriate PH levels using the government furnished corrosion inhibitor supply. 5.11 Contractors shall test the snow melt loop for leaks and recycle the glycol levels to 30% using the government furnished glycol supply. 5.12 Contractors shall provide a 1-year warranty on all parts and components installed. 5.13 Contractors shall provide a 1-year warranty on all craftsmanship work including, but not limited to, plumping, electrical, programming, and system balancing. Government owned Property: The current network control computer located inside the mechanical room shall remain in control by NSWCCD ARD Bayview and shall not be removed or disposed of by outside contractors. All extra controllers, glycol, corrosion inhibitor, valves, and replacement parts will remain with NSWCCD ARD Bayview. 7.0 Other Requirements N/A 8.0 Period of Performance: The contractor shall perform the above tasks no later than September 30, 2024. MAGNITUDE OF CONTSTRUCTION PROJECT: Between $100,000 and $250,000 Time for completion: All work shall be completed and accepted by the Government no later than 60 days after award. The Contractor shall begin performance within 10 calendar days and complete it within 75 calendar days QUESTIONS (a) Any questions in relation to this solicitation shall be submitted to by e-mail to pamela.a.ganster.civus.navy.mil. The cut-off date for questions is 2:00 PM EST on July 30, 2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$250,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2024
August 30, 2024
33964 N Main Ave, Bayview, ID
Related To This Project
Bayview, ID
Bid Date: Dec 16 2024
Bayview, ID
Bid Date: Aug 05 2024
Bayview, ID
Bid Date: Dec 16 2024
Bayview, ID
Bid Date: Sep 15 2023
Bayview, ID
Bid Date: Sep 21 2022
Ahsahka, ID
--
Weiser, ID
Bid Date: Aug 08 2024
Caldwell, ID
Bid Date: Aug 13 2024
Lewiston, ID
Bid Date: Aug 13 2024
Rupert, ID
Bid Date: Aug 06 2024
Post Falls, ID
Bid Date: Jul 25 2024
Kuna, ID
Bid Date: Aug 21 2024
Meridian, ID
Bid Date: Aug 12 2024
Boise, ID
Bid Date: Aug 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.