BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Carson, California. Completed plans call for the renovation of a 1,448-square-foot municipal facility.

General Description of Work: Renovate per floor plan. 1. Bonding, Insurance & Mobilization 2. Ground Floor North Wing 3. Ground Floor East Wing 4. Ground Floor South West Wing 5. Second Floor Lobby 6. Second Floor Lobby - Display Case 7. Second Floor City Council Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Prospective Contractor Questions Due: 7/25/2024 | 10:00 AM All bid questions shall be submitted online through PlanetBids by the due date and time listed on the Invitation for Bids. The City will coordinate responses and post them to PlanetBids by five (5) calendar days prior to the bid deadline for all interested bidders to review. Bidders are not to contact City personnel or Elected Officials with any questions or clarifications concerning this Invitation for Bids other than through PlanetBids. Any City response for this IFB that is not posted through PlanetBids is unauthorized and will be considered invalid. Estimated total for entire project is $3.21M. SCOPE The Contractor shall provide all materials, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the construction of the restroom facilities, including all incidental work described in the contract documents. The scope of work is contained in the contract documents. C. The scope of work includes, but is not limited to the following: 1. Renovation of existing (4)men and (4)women restrooms to provide the removal and replacement of all elements down to studs to upgrade the restrooms and meet current ADA standards. New walls, fire-rated as scheduled, doors, and hardware. New wall tile, floor tile and paint. New plumbing fixtures(water closets, urinals, lavatories) to be relocated as planned and tied into existing lines. New floor mounted partitions and privacy screens. New ceiling, lighting, and HVAC registers to be tied into existing electrical and mechanical systems. Refinish water heater closet and door to match new work where occurs. New soffits with low voltage LED stirp lighting where occurs. 2. 3. 4. Renovation of (1)co-ed restroom to update fixtures and finishes down to studs. New wall tile, floor tile and paint. New plumbing fixtures and accessories to be tied into existing lines. New ceiling, lighting, and HVAC registers to be tied into existing electrical and mechanical systems. New soffit with low voltage LED strip lighting. Existing door and fame to be refinished to match new work. Renovation of (1)break/meeting room to provide the removal and replacement of all elements except flooring doors and walls. New wall tile and paint. New upper and lower cabinetry, hardware, and hinges. New kitchen fixtures to be extended and tie into existing lines. New ceiling, soffits, lighting, and HVAC registers to be tied into existing electrical and mechanical systems. Existing door and fame to be refinished to match new work. Renovation of (2)kitchenettes to provide the removal of all elements and relocation of kitchenette. Removal of existing door and repair for new case opening. New wall tile, floor tile and paint. New upper and lower cabinetry, hardware and hinges. New plumbing fixtures and accessories to be extended to new location and tied into existing lines. New ceiling, lighting, and HVAC registers to be tied into existing electrical and mechanical systems. Reinstallation of fire hose compartment at new wall. 5. SECTION 01 1000 SUMMARY OF WORK Renovation of (2)kitchenettes to provide updated fixtures and finishes only. All adjacencies to remain. Removal of existing cabinetry, plumbing fixtures, and soffits and replace with new upper and lower cabinetry, hardware, and hinges. Plumbing fixtures and accessories to be relocated as planned and tied into existing lines. Existing Lighting to be relocated as needed in ceiling grid. HVAC to remain untouched. New wall/soffit where occurs. 6. 7. Renovation of (1)custodial closet to provide a new breakroom kitchenette area by removing all elements, existing wall and door opening and replace with new walls, fire rated as scheduled. New floor tile, wall tile and paint. New upper and lower cabinetry, hardware and hinges. New kitchen plumbing fixtures to be extended and tie into existing lines. New ceiling, lighting, and HVAC registers to be tied into existing electrical and mechanical systems. Refinish existing water heater closet and door to match new work where occurs. Renovation of (1) displace case area by providing the removal and replacement in its entirety. New full height cabinetry, hardware, and hinges with adjustable shelves and fixed led powered shelves as planned. Secure, lockable glass doors. New wall furring, painted. New low voltage integrated lighting to be tied into existing electrical system. D. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard as determined by the Engineer shall apply.

Award

Municipal

$1,697,000.00

Public - City

Renovation

16

33

2

5

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
110
Bidding Soon
2,322
All Active Projects
1,029
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

October 1, 2024

img_map_placeholder

701 E Carson St, Carson, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.