BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Warren, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number : 0000357995 The scope of work includes: replacing the existing water main along Curie Avenue between 8 Mile Road and Toepfer Road including replacement of gate valve in wells, hydrants, water services and all related work. The approximate quantities involved in this work are as follows below The Contractor shall furnish all materials, labor and equipment necessary and incidental to complete the Work as set forth in this bid advertisement in accordance with the City of Warren standards. These principal items include, but are not limited to: QUANTITY UNIT ITEM DESCRIPTION 44 ..................Ft Curb and Gutter, Rem 131 ................Syd Pavt, Rem 465 ................Syd Sidewalk, Rem 183 ................Syd Pavt Repr, Nonreinf Conc, 8 inch 20 ..................Syd Pavt Repr, Nonreinf Conc, 14 inch 131 ................Syd Driveway, Nonreinf Conc, 6 inch 3,112 .............Sft Sidewalk, Conc, 4 inch 217 ................Sft Sidewalk, Conc, 6 inch 252 ................Sft Curb Ramp, Conc, 4 inch 376 ................Sft Curb Ramp, Conc, 6 inch 164 ................Sft Curb Ramp, Conc, 8 inch 4 ....................Ea Gate Valve, 8 inch 4 .....................Ea Gate Well, 60 inch dia. 6 ....................Ea Fire Hydrant Assembly 335 .................Ft Water Main, DI, 8 inch, Tr Det G 2,288 ..............Ft Water Main, Fusible C900 PVC, DR14, 8 inch, Pipe Burst Question Deadline 07/25/2024 at 12:00 PM ET Questions are submitted online: No . - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 0.01 % - Labor and Materials Bond 100 % - Payment Bond 100 % Each bid must be accompanied by a pdf copy of either a certified check of the bidder, or a bid bond duly executed by the bidder as principal and having as surety thereon a surety company approved by the City, in the amount of 5% of the bid. General Requirements - Bid Deposit Required - Certified Payroll - Insurance Required - Local Service Required - Onsite Maintenance Required - Prevailing Wage Required - Samples Required - Warranty Information Required The City reserves the right to reject any or all bids and to waive any irregularities in bidding. The City also reserves the right to select multiple bids to fulfill the requirements of this project. No bid may be withdrawn after the scheduled closing time for receiving bids for at least sixty (60) days.

Bid Results

Water / Sewer

$1,068,837.00

Public - City

Site Work

21

5

4

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
77
Bidding Soon
1,516
All Active Projects
594
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

September 30, 2024

img_map_placeholder

Curie Ave, Warren, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.