BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 6, 2024 at 8:00 PM

Updated September 7, 2024

Site work and paving for a road / highway in Moberly, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Moberly Industrial Park Road Extension Project including the extension of McKeown Parkway, Roberston Road, and Fowler Road within the City of Moberly. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. This project will be partially funded with Federal funds from the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with that program. All relevant federal, state and local requirements apply. No pre-bid conference is provided for this project. A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. MODOT - Moberly Industrial Park Road Extension Project The proposed work, hereinafter called the work, includes: The extension of McKeown Parkway 1,059 ft west The extension of Robertson Road 2,612 ft north. The extension of Fowler Road 238 ft west to connect Fowler to Buchanan Road. All questions concerning the bid document preparation can be directed to Tom Sanders at 660-269-7652. Project specific questions can be directed to Austin Johnson, PE of Bartlett & West, Inc. at (573) 659-6737. All questions concerning this project during the bidding process shall be forwarded to the project contacts listed below. Austin Johnson, PE Bartlett & West, Inc. 601 Monroe Street, Suite 201 Jefferson City, MO 65101 Telephone Number (573) 659-6737 Question Deadline 08/09/2024

Award

Roads / Highways

$1,512,671.00

Public - City

Paving, Site Work

124

16

12

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
45
Bidding Soon
484
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

September 9, 2024

Project location map

McKeown Pkwy, Moberly, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.