BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Buffalo, New York. Completed plans call for the renovation of a 85,560-square-foot educational facility.

As of August 16, 2024, this project has not yet been awarded. The project will be presented to the Board for approval on Monday 8/19/24, if not it will be 9/16/24. Construction is tentatively set for the February Recess 2/17/2025 - 2/22/2025. Mail in bids are to be sent to the attention of: Cheektowaga-Maryvale UFSD 1050 Maryvale Drive Cheektowaga, NY 14225 ATT: Steve Lunden - BID If you should have any questions, please contact Young + Wright Architectural at (716) 842-1800. Documents will be available.Bidders or subcontractors who return all Bidding and Contract Documents in good condition within thirty (30) days after award of bid and have remitted payment, will receive a full refund of the deposit. Bid bond payable to the owner shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to accept or reject any and all bids, to re-advertise for new bids and to waive informalities and irregularities in connection with any bid. All RFIs due: Aug 01, 2024 by noon All questions, interpretations, clarifications, etc. pertaining to the bid documents must be made in the separate form provided on the next page, emailed to both Kara Yudikaitis at karay@youngandwright.com, Rob Smithgall at rsmithgall@youngandwright.com with the email subject "24016 Maryvale UFSD Record of Bidder Question" at least seven days prior to the bid opening. Only one question per form will be accepted. All questions are to reference a drawing number or specification section with page number. Reponses will be in the form of addendum. All potential bidders must self perform a minimum of 25% of the work, the Contractor shall provide 75% on site construction or supervision as proof of self-performance associated with the contract that they submit bids for (not including general overhead - i.e. submittals, RFI and RFP paperwork, construction meetings, etc.) Ideally construction will be isolated to February break and contingency of April break. To minimize disturbance to school. Longer disturbances must be approved and coordinated with the Owner. Crawlspace valve work can be scheduled for any fall/winter breaks ahead of millwork scope.

Bid Results

Educational

$59,875.00

Public - City

Renovation

9

13

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
93
Bidding Soon
2,423
All Active Projects
1,015
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

February 3, 2025

img_map_placeholder

1 Nagel Dr, Buffalo, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.