BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2024 at 7:00 PM

Updated November 19, 2024

Site work and paving for a road / highway in San Antonio, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project construction may include but is not limited to: slurry application, striping and pavement markings removal and installation, and any other items required due to the site conditions to accomplish the project scope. This task order contract shall be terminated one hundred and eighty (180) calendar days after acceptance of the first task order, or thirty (30) days after full execution of the contract, whichever comes first. The construction time (in calendar days) for each individual site will be negotiated between the City Engineer or Project Manager and the Contractor. The Contractor will be expected to begin construction for each individual site in accordance with Article 1- General Provisions, Section 1. 2. 4, Notice to Proceed and Commencement of Contract Times in the General Conditions - City of San Antonio Construction Contracts. The Contractor may also be limited to the amount of individual project sites open at any given time based on performance or available resources. Liquidated damages for construction time will be assessed on a per task order basis should the contractor fail to complete the construction in the specified calendar days as negotiated by the City Engineer or Project Manager. The Contractor shall refer to section 4. 3. 6 of the general conditions for claims for additional contract time due to inclement weather Project Location Each project location is considered a separate task. At this time, the tasks for this contract are unknown, therefore a listing will not be provided with the contract documents and specifications. Project Locations may be spread throughout the City. Each project site will be issued as a separate Task Order and quantities will be provided to the Contractor. It is anticipated that some project sites may require working time restrictions or night and weekend work. No additional compensation will be paid or given to the contractor for reduced working times or night and weekend work.

Bid Results

Roads / Highways

$2,183,485.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
101
Bidding Soon
2,072
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2024

January 7, 2025

Project location map

Multiple Locations, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.