BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and addition to an educational facility in Farmer City, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

As of August 14, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Project Description: Project consists of selective demolition of portions of 1,000 square foot existing concessions building and addition of approximately 2,000 square feet for public restrooms, storage and new concessions space. Work includes poured concrete footings, slab on grade, masonry foundations, wood framed walls, shop fabricated wood roof trusses, fiber cement siding, shingle roofing, epoxy flooring, hollow metal doors and frames, overhead doors, plumbing fixtures, VRF HVAC system and LED lighting. 1. Project cost range is anticipated to be $400,000 to $500,000. F. Construction Contract: Bids will be received for the following Work: 1. General Contract (all trades). document notes : Subcontractors and suppliers are encouraged to obtain plans through Roofing Contractors although additional sets will be available at the cost of printing. Contractors who do not submit a bid will forfeit their drawing deposit. Additional shipping charges will apply. TIME OF COMPLETION A. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. A bid bond, bank draft, or certified check made payable to the Blue Ridge CUSD #18, Farmer City, Illinois in the amount of ten percent (10%) of the Base Bid proposal shall accompany each bid as a guarantee that the Bidder, if awarded the Contract, will furnish satisfactory, execute the Contract and proceed with the Work. Upon failure to do so, he shall forfeit the deposit or amount of bid bond as liquidated damages, and no mistakes or errors on the part of the Bidder will excuse the Bidder or entitle him to a return of the deposit or bid bond. No Bidder may withdraw his bid for a period of 45 days after the date of opening thereof. The bid bonds or checks will, with the exception of those of the three lowest bidders, be returned seven days after the opening of bids and the remaining checks or bid bonds will be returned when the Contract is executed. The Board of Education reserves the right to reject any or all bids or any part thereof, to waive any informalities and irregularities in the bidding and to accept the bids deemed most favorable to their interest, after all bids have been examined and evaluated. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Educational

$671,700.00

Public - City

Addition, Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
27
Bidding Soon
412
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

September 6, 2024

img_map_placeholder

411 N John St, Farmer City, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.