BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Dobbin, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Water, Sanitary, Drainage and Paving Facilities Magnolia Springs Section 5B Question Deadline 08/07/2024 at 12:00 PM CT SANITARY SEWER IMPROVEMENTS 1 . 8 - inch SDR-26 ASTM D-3034 pipe, at all depths, including plugs, stacks, risers, connections, standard bedding, backfill and testing 2.6 - inch Near Side SDR-26 ASTM D-3034 sanitary sewer service lead, including wye, plugs, bedding and backfill, and cleanout, 3.6 - inch Far Side SDR-26 ASTM D-3034 sanitary sewer service lead, including wye, plugs, risers, bedding and backfill, and cleanout, 4.Sanitary sewer manhole, at all depths, including final rim elevation adjustment, Complete in Place. 5. Trenchless construction of 8 - inch sanitary sewer by wet bore method, Complete in Place WATER IMPROVEMENTS . 8 - inch C900 AWWA (DR18) waterline including all bends, fittings, gate valves and other water appurtenances, Complete in Place. . 8 - inch C-900 AWWA (DR18) waterline with restrained joint fittings, including all bends, gate valves and other water appurtenances, Complete in Place. . Standard Flush Valve apparatus including all leads, tees, valves, fittings, thrust blocking, and final elevation adjustment, Complete in Place. . Wet connection to existing 8" waterline, including removal of blow off valve & box, and plug & clamp, Complete in Place. STORM SEWER IMPROVEMENTS . 18 - inch RCP, ASTM C-76, Class III, at all depths, Complete in Place. . 24 - inch RCP, ASTM C-76, Class III, at all depths, Complete in Place. . 30 - inch RCP, ASTM C-76, Class III, at all depths, Complete in Place. . 4' x 7' Reinforced concrete box, all depths, Complete in Place. PAVING . Site preparation of cut and fill areas, stripping of topsoil, removal of vegetation, and stockpile. . Roadway excavation, including hauling, spreading, and compacting on-site to achieve final lot grades. This is the volumetric difference between the existing surface and the proposed top of subgrade, inside the right of way. An estimated volume of 400 CY has been calculated as required fill behind back of curb (2') and is included in the excavation quantity. No adjustments will be made based on variance of actual quantities. Start date- Beginning of October

Bid Results

Roads / Highways

$1,391,738.00

Public - County

Paving, Site Work

1

9

39

6

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
59
Bidding Soon
2,691
All Active Projects
1,049
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

September 13, 2024

img_map_placeholder

Multiple Locations, Dobbin, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.