BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Newberry Springs, California. Completed plans call for site work for a water / sewer project.

Provide all labor, tools, equipment, materials, incidentals, permits, and taxes necessary to drill a new domestic water well and conduct miscellaneous work at Camp Cady Wildlife Area. Location of Services: Camp Cady Wildlife Area, 48062 Mojave Trail, Newberry Springs, CA 92365 in San Bernardino County. License Required: C-57 Water Well Drilling Contractor Estimated Cost: $ 100,000.00 Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 3%. Failure to fulfill the DVBE requirement will render your bid non-responsive. DVBE Incentive: For evaluation purposes only, an incentive will be given to bidders who exceed the 3% DVBE participation requirements. Refer to the Instructions to Bidders. Small Business Preference and Small Business Subcontractor participation: five percent (5%) Small Business Preference will be granted to properly certified small businesses (a copy of your certification must be submitted with the bid proposal). As of March 1, 2015, Senate Bill 854 requires that No Contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations for projects greater than $25,000.00. Failure to register with DIR or list subcontractors not registered will render your bid non-responsive. additional site walkthorugh: Project Site Direction: To reach the project site, travel 21 miles east from Barstow on I15 N, and take the Harvard Road exit (Exit 206). Proceed south on Harvard Road for 2.8 miles, then turn left (east) onto Mojave Drive/Trail, a dirt road, and continue for 2.1 miles. Next, turn left (north) onto Fort Cady Road and drive for 0.5 mile, leading you to Residence #1 at the project site. The well site is located 250 ft west of Residence #1. Note that the sandy terrain can make it easy for the car to get stuck in the sand if you turn before reaching your destination. So, it's advisable to utilize a four-wheel drive truck to reach the project site. Upon DGS approval until June 30, 2025. Proposed Start of Construction Date - December 2024 ; Construction must be completed within FIFTY (50) WORKING DAYS upon receipt of the official "Notice of Start Date" from CDFW . DVBE (3%)

Post-Bid

Water / Sewer

$100,000.00

Public - State/Provincial

Site Work

3

8

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
45
Bidding Soon
656
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

December 2, 2024

img_map_placeholder

48062 Mojave Trail, Newberry Springs, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.