Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Miami, Florida. Completed plans call for the renovation of a water / sewer project.
ESTIMATED COST: $646,617 5 DESCRIPTION OF WORK A. The project consists of furnishing all drawings, obtaining permits, and providing all materials, labor, and equipment necessary to replace the existing built-up roofs for building facilities located at the NW 67th Street Pump Sation, NW Wellfield, NW 30th Avenue Pump Station, and SW Wellfield to include, but not limited to, removal and disposal of existing roof materials, providing a temporary/permanent roof and furnishing and installing a new 3-ply modified bituminous built-up roof system as manufactured by GAF or equal. The Bidder shall field-verify the actual scope of work and the amount of materials required to complete the work as shown on the drawings and as specified herein before submitting a bid. The project includes but is not limited to: 1. Completing all the necessary activities to obtain roofing permit approval for each roof in the scope of this project and ensure compliance with the requirements of the Miami-Dade County Building Department and other relevant agencies or jurisdictions. These activities include, but are not limited to, preparing the permit application, and submitting a comprehensive roofing package containing shop drawings, wind test results, and other relevant documents to obtain an approved permit. All documentation required for permitting purposes shall comply with the Florida Building Code. 2. Provide an Asbestos Abatement Contractor to safely and legally remove all the existing asbestos-containing materials (ACM) roofing materials, where required. 3. Removing all roofing materials and/or appurtenant structures. 4. Replacing all lightweight insulating concrete per Specifications. 5. Loading, transporting, and disposal of removals. 6. Furnishing and installing new permanent/temporary roofs, new insulating lightweight concrete, and new built-up bituminous roofing systems. 7. Providing a new lightning protection system for all roofs under this project’s scope. 8. Restoring site to existing or better condition; together with all other miscellaneous items and appurtenant work for a complete, functional and satisfactory installation of the project. 9. Provide a 20 year guarantee (NDL) no dollar limit warranty with an “Enhanced Wind Coverage,” (Wind Rider) by the manufacturer for winds in excess of 120 mph minimum, including hail, hurricanes, tornadoes, covered by the warranty. B. The Project shall be done in three Phases: Priority Groups 1, 2, and 3 as described in the Sequence of Construction. C. These specifications and drawings are the Design Criteria for Work on the existing roofs. D. The general requirements for this project are, but not limited to, the following: 1. Additional bidding requirements: a. Review all job requirements. b. Perform field inspections of the existing conditions. c. Inform the owner in writing of any site condition deficiencies that will prevent the contractor from performing the work or meeting the requirements. Otherwise, the contractor shall accept the visible conditions. d. In submitting a proposal, the contractor assumes full responsibility for the design, drawings, and obtaining permits for each of the roofs, including but not limited to, reporting any discrepancies, errors, inconsistencies, omissions, or code violations in the criteria drawings, except for those reported by the contractor to the Design Criteria Provider (DCP) and Owner during the proposal period. e. After the proposal period, the contractor is awarded the project and forever waives any and all rights and additional compensation and/or time extensions based on the aforesaid discrepancies, errors, inconsistencies, omissions, or code violations. Miami-Dade has released all rights to Criteria Drawings. E. Once awarded the project, the Contractor shall perform the following before starting the design : 1. Review project criteria specifications and scope of work. 2. Visit and inspect each roof, to field conditions and take measurements. 3. Review the following testing completed: a. Core test for roofing material make-up. b. Testing provided. 4. Review the results of the tests listed above with the contractor selected roofing manufacturer’s requirements, including warranty. 5. Hire the services of a qualified, licensed structural engineer to provide wind pressures for every roof in the scope of work. 6. Hire the services of a qualified, licensed architect or engineer to sign & seal any drawings required by the building department, for every roof in the scope of work. 7. Review asbestos surveys for each roof. Hire a Florida licensed asbestos abatement contractor to remove the material and follow all requirements of governing bodies having jurisdiction. Coordinate with Mr. Jose Tovar, Environmental Compliance Supervisor, for Asbestos & Industrial Waste Compliance (786-402-7603). Coordinate the sequence of work with the Construction Manager Performance Bond :Yes Payment Bond Required :Yes Bid Bond Required: Yes Liquidated Damages : Yes
Post-Bid
Water / Sewer
$646,617.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2024
October 15, 2024
6800 SW 87th Ave, Miami, FL
Related To This Project
Miami, FL
Bid Date: Aug 28 2024
Miami, FL
Bid Date: Aug 21 2024
Miami, FL
Bid Date: Aug 14 2024
Miami, FL
Bid Date: Aug 30 2024
Miami, FL
Bid Date: Aug 30 2024
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Aug 27 2024
Miami, FL
Bid Date: Sep 10 2024
Miami, FL
Bid Date: Aug 20 2024
Miami, FL
Bid Date: Aug 22 2024
Miami, FL
Bid Date: Aug 29 2024
Miami, FL
Bid Date: Aug 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.