Renovation of a water / sewer project in Miami, Florida. Completed plans call for the renovation of a water / sewer project.

ESTIMATED COST: $646,617 5 DESCRIPTION OF WORK A. The project consists of furnishing all drawings, obtaining permits, and providing all materials, labor, and equipment necessary to replace the existing built-up roofs for building facilities located at the NW 67th Street Pump Sation, NW Wellfield, NW 30th Avenue Pump Station, and SW Wellfield to include, but not limited to, removal and disposal of existing roof materials, providing a temporary/permanent roof and furnishing and installing a new 3-ply modified bituminous built-up roof system as manufactured by GAF or equal. The Bidder shall field-verify the actual scope of work and the amount of materials required to complete the work as shown on the drawings and as specified herein before submitting a bid. The project includes but is not limited to: 1. Completing all the necessary activities to obtain roofing permit approval for each roof in the scope of this project and ensure compliance with the requirements of the Miami-Dade County Building Department and other relevant agencies or jurisdictions. These activities include, but are not limited to, preparing the permit application, and submitting a comprehensive roofing package containing shop drawings, wind test results, and other relevant documents to obtain an approved permit. All documentation required for permitting purposes shall comply with the Florida Building Code. 2. Provide an Asbestos Abatement Contractor to safely and legally remove all the existing asbestos-containing materials (ACM) roofing materials, where required. 3. Removing all roofing materials and/or appurtenant structures. 4. Replacing all lightweight insulating concrete per Specifications. 5. Loading, transporting, and disposal of removals. 6. Furnishing and installing new permanent/temporary roofs, new insulating lightweight concrete, and new built-up bituminous roofing systems. 7. Providing a new lightning protection system for all roofs under this project’s scope. 8. Restoring site to existing or better condition; together with all other miscellaneous items and appurtenant work for a complete, functional and satisfactory installation of the project. 9. Provide a 20 year guarantee (NDL) no dollar limit warranty with an “Enhanced Wind Coverage,” (Wind Rider) by the manufacturer for winds in excess of 120 mph minimum, including hail, hurricanes, tornadoes, covered by the warranty. B. The Project shall be done in three Phases: Priority Groups 1, 2, and 3 as described in the Sequence of Construction. C. These specifications and drawings are the Design Criteria for Work on the existing roofs. D. The general requirements for this project are, but not limited to, the following: 1. Additional bidding requirements: a. Review all job requirements. b. Perform field inspections of the existing conditions. c. Inform the owner in writing of any site condition deficiencies that will prevent the contractor from performing the work or meeting the requirements. Otherwise, the contractor shall accept the visible conditions. d. In submitting a proposal, the contractor assumes full responsibility for the design, drawings, and obtaining permits for each of the roofs, including but not limited to, reporting any discrepancies, errors, inconsistencies, omissions, or code violations in the criteria drawings, except for those reported by the contractor to the Design Criteria Provider (DCP) and Owner during the proposal period. e. After the proposal period, the contractor is awarded the project and forever waives any and all rights and additional compensation and/or time extensions based on the aforesaid discrepancies, errors, inconsistencies, omissions, or code violations. Miami-Dade has released all rights to Criteria Drawings. E. Once awarded the project, the Contractor shall perform the following before starting the design : 1. Review project criteria specifications and scope of work. 2. Visit and inspect each roof, to field conditions and take measurements. 3. Review the following testing completed: a. Core test for roofing material make-up. b. Testing provided. 4. Review the results of the tests listed above with the contractor selected roofing manufacturer’s requirements, including warranty. 5. Hire the services of a qualified, licensed structural engineer to provide wind pressures for every roof in the scope of work. 6. Hire the services of a qualified, licensed architect or engineer to sign & seal any drawings required by the building department, for every roof in the scope of work. 7. Review asbestos surveys for each roof. Hire a Florida licensed asbestos abatement contractor to remove the material and follow all requirements of governing bodies having jurisdiction. Coordinate with Mr. Jose Tovar, Environmental Compliance Supervisor, for Asbestos & Industrial Waste Compliance (786-402-7603). Coordinate the sequence of work with the Construction Manager Performance Bond :Yes Payment Bond Required :Yes Bid Bond Required: Yes Liquidated Damages : Yes

Post-Bid

Water / Sewer

$646,617.00

Public - County

Renovation

15

14

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
44
Bidding Soon
1,075
All Active Projects
481
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2024

October 15, 2024

img_map_placeholder

6800 SW 87th Ave, Miami, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.