BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2024 at 8:00 PM

Updated October 4, 2024

Site work and paving for a civil project in Raton, New Mexico. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

As of October 3, 2024 project was awarded to KC & MC Services, LLC, awarded amount is $74,671.04. The project includes constructing a new sludge field, including a surrounding berm (approximately 1.5-4' high), diversion ditch, access road, and culverts with end sections and erosion protection. The area of the new sludge field is approximately 25 acres. Question Deadline 08/06/2024 Questions posted to the Engineer after may not be answered. All questions about the meaning or intent of the Bidding Documents shall be submitted to the Engineer in writing. Replies will be issued to all parties recorded by the Engineer as having received the Bidding Documents. Questions received less than nine (9) calendar days prior to the date for opening of Bids will not be answered (See Notice of Invitation to Bid for the actual question deadline) Bid security in the amount of 5% of the amount bid must accompany each Bid in accordance with the Instructions to Bidders. Site Directions: Hereford Ave. dead ends to the east at the Raton Wastewater Treatment Facility, which is where the project is located.

Award

Water / Sewer

$74,671.00

Public - City

Paving, Site Work

10

11

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
42
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

October 14, 2024

Project location map

520 Hereford Ave, Raton, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.