BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2024 at 8:00 PM

Updated September 25, 2024

Site work for a bridge / tunnel in Duncan, British Columbia. Completed plans call for site work for a bridge / tunnel.

The Holt Creek Bridge Replacement Project will replace the existing Holt Creek Timber Trestle with a new single-span steel structure completed with timber deck for pedestrians, cyclists, and equestrians. The new bridge structure will ensure a safe and accessible trail connection for Trans Canada Trail active transportation corridor, connecting the Lake Cowichan, Shawnigan Lake and Duncan areas. Project Location: The site is located at Holt Creek along the Cowichan Valley Trail, 7 km West of Duncan, BC. Documents can be obtained from www.bcbid.gov.bc.ca. Construction documents for this project are copyright of the Province of British Columbia.

Award

Bridges / Tunnels

$4,468,974.00

Public - State/Provincial

Site Work

15

6

4

2

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
98
Bidding Soon
2,436
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

October 1, 2024

Project location map

Multiple Locations, Duncan, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.