BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work, paving and renovation of a mixed-use development in Morganton, North Carolina. Design plans call for the renovation of a educational facility; for site work for a educational facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of July 24, 2025, per owner, project is in design phase. Design team identified. This Campus Repair & Renovation project is located on the campus of the NC School for the Deaf in Morganton, NC. The planned work includes: (1) Campus Exterior Lighting LED Replacement ($952,000): This project consists of replacing and installing new exterior lighting across the entire NC School for the Deaf (NCSD) campus in Morganton. This includes fixtures and associated infrastructure. Isolated concrete/asphalt demolition and repair will occur. Existing lighting is too dim, or nonexistent and new LED lighting will be more efficient. (2) Alumni Field and Track Bleachers ($206,000): The Alumni Field at the NC School for the Deaf (NCSD) in Morganton does not have any permanent bleachers for spectators. The existing track and field is in a dilapidated state. The track will be repaved and minor field drainage and reseeding will occur. Bleachers will be installed for 200 spectators and participants for NCSD events. NCSD will also welcome the new neighboring NC School of Science and Mathematics to utilize the field and track for combined morale events. (3) Campus Paving and Restriping ($625,000): The pavement across the NC School for the Deaf (NCSD) campus in Morganton needs an overlay with potential milling necessary to prepare the surface. The current pavement has several potholes, spalling locations, tripping hazards and deteriorated pavement and striping. The pavement shall be overlayed, restriping will occur, and minor associated drainage improvements will be made to promote a safe pedestrian traffic, driving and parking environment at the NCSD campus. Total Project Budget $1,783,000 Source of Funds 2021-2022 Repair and Renovation Reserve 2022-2023 Repair and Renovation Reserve Approved OC-25 #'s #201935350116 (Campus Exterior Lighting LED Replacement) #202135350113 (Alumni Field and Track Bleachers) #202135350114 (Campus Paving and Restriping) In order to offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina. The method of Contractor Selection has not been Determined at this time.

Design

Educational

$1,783,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
143
Bidding Soon
1,757
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2026

Project location map

517 W Fleming Dr, Morganton, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.