Site work and paving for a road / highway in Peoria, Arizona. Working plans call for site work for a road / highway; and for paving for a road / highway.
As of December 2, 2025, a construction manager at risk (CMAR) has been selected for the project. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: Question Deadline 08/14/2024 at 5:00 PM MT Online Portal. Contact Information: Viorel Gheorghita, Viorel.Gheorghita@peoriaaz.gov, All questions regarding the solicitation should be sent in writing to the designated purchasing agent via email or through Messages/Opportunity Q&A on the City of Peoria's Purchasing Portal (Bonfire). The City of Peoria (City) is seeking a qualified heavy civil roadway and drainage CMAR to provide construction services for four separate Capital Improvement (CIP) Projects. All four of the projects are included in this solicitation and would be awarded together under a phased project approach with the initial phase of the award being pre-construction services followed potentially by multiple Guaranteed Maximum Price (GMP) contracts. The project Scope of Work is for Construction of a 4-lane or 6-lane arterial parkway (will depend on traffic analysis recommendation) from Loop 303 to SR74 that will include but not limited to: curb, gutter, sidewalk, signage, striping, bike lanes, streetlights, catch basins, scuppers, landscape, landscape irrigation in accordance with City Standards. (Exhibit A) o Wide raised medians with landscaping from Loop 303 to SR74 (Exhibit A) o Potential intersection improvements at major crossroads that may include: Dixileta Drive, Ashler Hills Road (located between the north ramp terminals of the SR303L), Dove Valley Road, Old Carefree Highway, and SR 74. o Traffic signals and/or modifications to existing traffic signals at major crossroads. o Interconnect conduit and fiber from Loop 303 and SR74 o Storm drainage improvements may include but not limited to: large box culverts and/or pipelines, multiple retention basins, spillways, headwalls, catch basins, energy dissipators, manholes, channels and drywells o ~24-Inch waterline installation from Loop 303 - to SR74 (UT00527) o ~18-inch sewer installation from Loop 303 - to SR74 (UT00528) o ~24-Inch reclaimed waterline from Loop 303 to SR74 (UT00529) o Undergrounding existing APS 12kV overhead powerlines along the east side of Lake Pleasant Parkway o Joint trench for City & private communication utilities from Loop 303 to SR74 o New bridge structure, at-grade or elevated, located at the CAP o Retaining walls in and around the new CAP bridge structure. The City of Peoria Capital Improvement Program has approved funding for construction of the project. The City of Peoria's cumulative total capital budget in the FY25 Capital Improvement Program for the four projects is $99,580,000, of which approximately $75,500,000 is programmed for construction.
Pre-Construction/Negotiated
Roads / Highways
$75,500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2024
March 1, 2027
N Lake Pleasant Pkwy, Peoria, AZ
Related To This Project
Peoria, AZ
--
Peoria, AZ
Bid Date: Sep 19 2024
Peoria, AZ
Bid Date: Oct 02 2024
Peoria, AZ
--
Peoria, AZ
Bid Date: Nov 07 2024
Peoria, AZ
Bid Date: Oct 25 2024
Peoria, AZ
Bid Date: Apr 11 2025
Peoria, AZ
Bid Date: Aug 08 2024
Peoria, AZ
--
Peoria, AZ
--
Peoria, AZ
Bid Date: Jul 02 2024
Peoria, AZ
Bid Date: Aug 06 2024
Peoria, AZ
Bid Date: Jul 25 2024
Peoria, AZ
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.