BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Vallejo, California. Contact the soliciting agency for additional information.

Scope of Work 1. Contractor agrees to provide to the Department of California Highway Patrol (CHP) Golden Gate Division Office, the services described herein: furnish all supplies, materials, tools, equipment, labor, personnel, and supervision; pay all taxes, insurance, bonds, license and permit fees, and all other direct and indirect costs necessary to provide Liebert System Cooling Unit Maintenance Services in accordance the manufacturer's preventive maintenance recommendations and the terms set forth in this Agreement. A. License Requirement: Contractors State Licensing Board (CSLB), C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor. B. Contractor shall provide a Certificate of Insurance in accordance with the Insurance Requirements found in this Agreement (Exhibit E). 2. The services shall be performed at: CHP Golden Gate Division Office 1551 Benicia Road Vallejo, CA 94591 3. The services shall be provided during: Normal working hours, Monday through Friday from 8:00 a.m. to 5:00 p.m., excluding State holidays. Office will be closed if any holiday falls on or is observed on a weekday, unless otherwise stated. Contractor shall check-in and check-out with CHP on-site contact person or designee upon each service call to provide verification that service has been provided. The term of the resulting agreement is anticipated to be effective from November 1, 2024, through October 31, 2027. The agreement term may change if CHP makes an award earlier than expected or if CHP cannot execute the agreement in a timely manner due to unforeseen delays. CHP reserves the right to extend the term of the resulting agreement as necessary to complete or continue the services. Agreement extensions are subject to satisfactory performance, funding availability, and possibly approval by Department of General Services (DGS). Question Deadline 08/02/2024 at 10:00 AM PT Bidders shall immediately notify CHP if clarification is needed regarding the services sought or questions arise about the IFB and/or its accompanying materials, instructions, or requirements. Bidders shall submit questions via email to Cierra Wallin at Cierra.wallin@chp.ca.gov. Following the question submission deadline, the CHP will post a summary response of the questions and answers to be viewed electronically. Mail or arrange for hand delivery of the bid package to the Department of California Highway Patrol, Business Services Section, Contract Services Unit. Bids may not be transmitted electronically by fax or email. CHP rights In addition to the rights discussed elsewhere in this IFB, CHP reserves the following rights. a. IFB corrections 1) CHP reserves the right to do any of the following up to the bid submission deadline: a) Modify any date or deadline appearing in this IFB or the IFB Time Schedule. b) Issue clarification notices, addenda, alternate IFB instructions, forms, etc. c) Waive any IFB requirement or instruction for all bidders if CHP deems said requirement or instruction unnecessary, erroneous or unreasonable. d) Allow bidders to submit questions about any IFB change, correction or addenda. If CHP allows such questions, specific instructions will appear in the cover letter accompanying the document. 2) If applicable, CHP will mail, email, or fax written clarification notices or addenda to all persons/firms receiving this IFB. Exceptions may occur, when CHP decides, just before or on the bid due date, to extend the submission deadline. If this occurs, CHP may notify potential bidders of the extension by fax, email, or by telephone. CHP will follow-up any verbal notice in writing by fax or mail. b. Collecting information from bidders 1) CHP may request a bidder to submit additional documentation following the bid opening and/or evaluation. CHP will advise the bidders orally, via email, or in writing of the documentation that is required and the timeline for submitting the documentation. CHP will follow-up oral instructions in writing by fax, email, or mail. Failure to submit the required documentation by the date and time indicated may cause CHP to deem a bid non-responsive. 2) At its sole discretion, CHP reserves the right to collect, by mail, email, fax or other method, the following omitted and/or additional information. a) Data or documentation omitted from any submitted IFB attachment/form. b) Information/material needed to clarify or confirm certifications or claims made by a bidder. c) Information/material or form(s) needed to correct or remedy an immaterial defect in a bid package. c. Immaterial bid defects 1) CHP may waive any immaterial defect in any bid package and allow the bidder to remedy those defects. CHP reserves the right to use its best judgment to determine what constitutes an immaterial deviation or defect. 2) CHP's waiver of an immaterial defect in a bid package shall in no way modify this IFB or excuse a bidder from full compliance with all bid requirements. d. Correction of clerical or mathematical errors 1) At its sole discretion, CHP reserves the right to overlook, correct or require a bidder to remedy any obvious clerical or mathematical errors on a bid form. 2) If the correction of an error results in an increase or decrease in the total price, CHP shall give the bidder the option to accept the corrected price or withdraw their bid. 3) Bidders may be required to initial corrections to costs and figures on the bid form if the correction results in an alteration of the cost(s) offered. 4) If a mathematical error occurs in a total or extended price and a unit price is present, CHP will use the unit price to settle the discrepancy. e. Right to remedy errors CHP reserves the right to remedy errors caused by: 1) CHP office equipment malfunctions or negligence by agency staff. 2) Natural disasters (i.e., floods, fires, earthquakes, etc.). f. No agreement award or IFB cancellation The issuance of this IFB does not constitute a commitment by CHP to award an agreement. CHP reserves the right to reject all bids and to cancel this IFB if it is in the best interest of CHP to do so.

Post-Bid

Municipal

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
90
Bidding Soon
1,843
All Active Projects
780
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

November 1, 2024

img_map_placeholder

1551 Benicia Rd, Vallejo, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.