BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a warehouse / distribution facility in San Jose, California. Working plans call for the renovation of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

As of November 8, 2024, project will rebid. No definite date for the rebid. Estimated Amount: $10,000,000.00. The Work will consist of: o Demolition Work. o Site Grading and Site Improvement. o Providing security fence and associated site work. o Interior Improvement Work o Providing wire mesh partitions in the warehouse areas, including doors & gates. o Providing workstations at offices, open office, and in the warehouse area, including worktables and chairs. o Exterior Improvement Work o Providing loading dock equipment and warehouse accessories, including parking bumpers, bollards, guard rails, column protectors, door rail protectors and door operators o Providing security fence and associated site work. o Structural o Providing concrete pads, foundations, slabs on grade, retaining walls, and other associated structural work. o Mechanical o Providing roof top exhaust fan, rooftop air conditioning unit, humidifiers, and associated HVAC work. o Electrical and Low Voltage o Providing lighting and power on the interior and exterior warehouse area, and other associated electrical work. o Providing data cables, Wi-Fi access waypoint, card readers and all other associated low voltage work. o Plumbing o Providing pipes, fittings, valves, drain and all other accessories for all plumbing modifications/ improvements, and all other associated plumbing work. o Fire Protection Providing fire alarm system and fire sprinkler modifications/improvements. o Permits o Contractor to include allowance for obtaining railroad permit and associated insurance costs. o Equipment o Contractor to furnish Yale MR16N Forklift model will need to have the 3 stage 334" lift capability or equivalent o Contractor to assume that all soil is to be off hauled to class II facilities . The Contract Time for the completion of all the Work of the Project is 330 calendar Days from the Commencement Date in Owner's Notice to Proceed. Designated portions of the Work must be completed according to the following Milestones. Question Deadline 09/09/2024 at 5:00 PM PT PN - 21.222.1, 220320.00, 422060

Final Planning

Warehouse / Distribution

$9,700,000.00

Public - County

Renovation, Site Work

93

37

13

8

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
73
Bidding Soon
1,505
All Active Projects
651
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

May 8, 2025

img_map_placeholder

2144 Oakland Rd, San Jose, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.