BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2024 at 8:00 PM

Updated September 11, 2024

Demolition, site work, paving and new construction of a mixed-use development in Ridgecrest, California. Completed plans call for the demolition of a playground / park / athletic field; for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The project, in general, consists of but not limited to, demolition of an existing restroom building and play structure area, a portion of the parking lot and adjacent concrete walkways. Grading for new building pad, play equipment areas and parking. Reconnect existing utilities to new restroom building. Construct new accessible parking stalls, install pre-manufactured restroom building, play equipment and rubber safety surfacing. Modify the existing sprinklers system as required to allow for new park improvements. Alternate Bid #1: New 31'-0" x 43'-6" x 52'-5" with 14'-0" entry height custom triangle shade. Alternate Bid #2: New 58'-0" x 48'-0" x 50'-0" with 14'-0" entry height custom triangle shade. Alternate Bid #3: New 65'-6" x 58'-6" x 46'-0" with 14'-0" entry height custom triangle shade. Alternate Bid #4: New 51'-0" x 51'-0" x 38'-6" with 14'-0" entry height custom triangle shade. Liquidated Damages $500.00 a day Project Duration 80 Working Days. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Reservation of Rights: Owner specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. Question Deadline 08/09/2024 at 5:00 PM PT Bidders must direct all questions about the meaning or intent of Bidding Documents to Owner in writing. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by written Addenda. Construction Estimate: $356,500

Award

Playgrounds / Parks / Athletic Fields

$401,417.00

Public - County

Demolition, New Construction, Paving, Site Work

4

12

2

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
20
Bidding Soon
235
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

September 19, 2024

Project location map

300 E French Ave, Ridgecrest, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.