BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Site work, paving and new construction of a mixed-use development in Fruitland Park, Florida. Completed plans call for the construction of a 20,144-square-foot, two-story above grade fire / police facility; for site work for a fire / police facility; and for paving for a fire / police facility.

*This project is currently under construction. It broke ground in September 2024. Scorpio is the CM and is soliciting Bids for the Fruitland Park Public Safety Building. The Permit Documents are included in the documents folder. As of August 13, 2024, The A/E team has released Addendum 01 and RFI responses for the Fruitland Park Public Safety Building. The AudioVisual and Electrical scopes of work are the major scopes affected. Please revise all affected proposals by this Thursday, August 15th at 2 PM so that we can incorporate changes into the GMP. The bid date has been extended per addendum 1 from August 9 to August 15, 2024. • Scope of Work is to be completed and turned in with the bid with a "Y" or "N" in each row. The green highlighted cells showing the relevant specification sections are also to be completed with a "Y" or "N". Scope of Work: Concrete, Tilt Wall, Masonry, Steel, Metal Trusses, Casework, Thermal and Moisture Protection, Roofing, Insulation, Doors, Overhead Doors, Glazing, Framing, Ceilings, Flooring, Painting, Specialties, Kitchen Equipment, Lockers and Storage, Window Treatments, Elevator, Fire Protection, Plumbing, HVAC, Electrical, Communications, Security, Sitework, Landscaping. New site construction - Driveways, Parking Lots, Sidewalks, Fencing, Utilities & Storm Drainage System. 1st Floor-Police & Fire Dept. Operations, Apparatus Bay & Sallyport - 14,138 sf 2nd Floor-Police & Fire Dept. Administration & Bunk Room - 6,006 sf New public safety building - 20,144 sf total. Construction type iib with fully automatic sprinkler system. Mixed occupancy business-b, storage-s2 & residential-r2 Although a firm timeline has not been confirmed, construction is not expected to start prior to October 2024.

Under Construction

Fire / Police

$9,000,000.00

Public - City

New Construction, Paving, Site Work

127

30

43

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
156
Bidding Soon
2,517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

October 1, 2024

Project location map

506 W Berckman St, Fruitland Park, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.