Site work and new construction of a mixed-use development in Cedar Rapids, Iowa. Completed plans call for the construction of a 2,575-square-foot water / sewer project; and for site work for a water / sewer project.
The Work generally consists of constructing a 2,575 square foot pre-cast building and installation of central heating and cooling equipment to serve the terminal and demolition of existing central heating and cooling equipment in the terminal and associated architectural, structural, mechanical, plumbing, electrical, technology, and sitework at the Eastern Iowa Airport in Cedar Rapids, Iowa. Question Deadline 08/02/2024 at 5:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, either through mail or email. Contact individual shall be as follows: Eric Scott Foth Infrastructure & Environment, LLC 411 6 th Avenue SE, Suite 400 Cedar Rapids, IA 52401 319.365.9565 (Phone) Eric.Scott@Foth.com Questions received less than seven days prior to the date for opening of Bids may not be answered. The Cedar Rapids Airport Commission anticipates a Notice-to-Proceed to be issued no earlier than immediately following submittal and approval of the properly executed contract documents following contract award, anticipated for August 26, 2024, and has established the following completion requirements: o Phase 2: Complete by May 1, 2025; o Terminal Central Water Plant: Systems fully operational by October 30, 2025; o Project Complete by April 23, 2026; o Final Completion: 120 Calendar Days following Project Completion date. All project work shall be substantially completed within the stated timeframe. This project is subject to liquidated damages as prescribed within the project manual. Bid security in the amount of Five percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful bidder shall be required to provide Performance and Payment Bonds, each in the amount of 100 percent of the Contract Price. Bid security and other bonds shall be provided on forms furnished by the Owner. Timetables: Goals for minority participation for each trade: 1.7% Goals for female participation in each trade: 6.9% The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this DOT-assisted contracts. In accordance with 49 CFR Part 26.45, the sponsor has established a contract goal of 0.37 percent participation for small business concerns owned and controlled by certified socially and economically disadvantaged enterprise (DBE). The bidder shall make and document good faith efforts, as defined in Appendix A of 49 CFR Part 26, to meet this established goal. The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the current schedule of wage rates established by the United States Department of Labor. The right is reserved, as the Cedar Rapids Airport Commission may require, to reject any and all bids, to waive any informality in the bids received, and to re-advertise
Post-Bid
Water / Sewer
$7,500,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2024
August 26, 2024
2121 Arthur Collins Pkwy SW, Cedar Rapids, IA
Related To This Project
Cedar Rapids, IA
--
Cedar Rapids, IA
--
Cedar Rapids, IA
--
Cedar Rapids, IA
--
Cedar Rapids, IA
Bid Date: Jun 17 2025
Cedar Rapids, IA
--
Cedar Rapids, IA
--
Cedar Rapids, IA
--
Cedar Rapids, IA
Bid Date: Aug 20 2024
Cedar Rapids, IA
Bid Date: Aug 08 2024
Cedar Rapids, IA
Bid Date: Jul 22 2024
Cedar Rapids, IA
Bid Date: Jul 16 2024
Cedar Rapids, IA
Bid Date: Jul 17 2024
Cedar Rapids, IA
Bid Date: Jun 20 2024
Cedar Rapids, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.