BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Carl Junction, Missouri. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

The scope of this project includes, but is not limited to, the following: site work and renovation of an educational facility. As of July 24, 2024, a construction manager has been selected for this project. A firm construction timeline for this project has not yet been released. The Project Site is located just South of Wise St. & West of Verbryck Ave. in the city of Carl Junction, state of MO and county of Jasper. The Project includes providing all labor, materials, equipment, supervision, accessories, hauling, storage, tools and incidentals necessary for the construction and completion of the work according to the Bidding and Contract Documents and consists of the following: Concrete, Structural Steel, Metal Stud Framing, Rough Carpentry, Millwork, Doors, Windows, Hardware, Overhead Doors, Gypsum Board, ACT, Flooring, Painting, Specialties, Lockers, Archery Curtain, Telescopic Seating, Pre-Engineered Metal Building ERECTION including Standing Seam Roof, Metal Wall Panels, Trims, Roof & Wall Insulation and Liner Panel, Plumbing, HVAC, Electrical and Fine Grading and Sodding around the building. The bidders understand that the CM and the Owner reserves the right to award the contract to the best responsible bidder, and to reject any or all bids and/ or to waive any and all technicalities, irregularities or informalities in the bidding process as they see fit. (Refer to Division 00 documents for a clarification on evaluating lowest responsible bidder). No bids may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of bids. RETAINAGE: The Owner shall retain an amount of 5% of the cost of construction throughout the Construction Period. The retainage will not be reduced during the project and will only be released after final payment is paid to the CM as a part of the CM's Project Closeout process. PREVAILING WAGE: This project DOES comply with the current MO DOL Prevailing Wage Order for Jasper County, MO #31. See Section 00 51 00 for Wage Order. TAX EXEMPT STATUS BIDS SHALL NOT include Sales tax on material. PERFORMANCE AND PAYMENT BOND: A Performance and Payment Bond may be required of the successful bidders in the amount of 100% of the contract amount. The bond amounts will need to be listed on the bid form in the space provided. It shall not be included in the Bid Package total Base Bid or Alternate(s). WITHDRAWAL OF BIDS: Bids may not be withdrawn for a period of (60) sixty days. DAMAGES: Real Damages/Delay Damages in the amount of $500.00 per calendar day and Liquidated Damages in the amount of $1,000.00 per calendar day may be assessed every day that work is not completed per the Construction Schedule and after the scheduled final completion date is not achieved. Any questions related to Bid Document procurement or clarifications of the bidding documents are to be directed to the CM. Last Day For Questions shall be the Thursday prior to the Bid Day: RE Smith Construction Company Carl Junction Schools JROTC & ARCHERY Attn: Clint Walton estimating@resmithconst.com 1036 W. 2nd Street Joplin, MO 64801 (417) 623 4545

Post-Bid

Educational

$3,000,000.00

Public - City

Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
21
Bidding Soon
475
All Active Projects
202
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

September 6, 2024

img_map_placeholder

Verbryck Ave & Wise St, Carl Junction, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.