BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Atwood, Illinois. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Project Includes The Following Work: Division A: Wastewater Treatment Plant Improvements The Projects Generally Consist Of Rehabilitation, Upgrades, And General Improvements At The Existing Wastewater Treatment Plant. The Project Involves Installation Of A New Influent Fine Screen, Upgrades To The Plants Aeration System Including Blowers And Air Piping. A New Storage Shed Will Be Constructed Near The Existing Plant Building To House The New Blowers. Other Miscellaneous Work Includes But Not Limited To, Construction Of A Concrete Pad For The Influent Screen, And Construction Of A Concrete Walkway. This Work Shall Include All Labor, Supervision, Materials, Supplies, Transportation, Equipment, And Services Necessary And Required To Perform The Project As Set Forth In The Contract Documents. Division B: Sanitary Sewer Rehabilitation The Project Involves Sewer Lining By Curing In Place Pipe (Cipp) Lining. The Bid For The Cipp Trunk Sewer Lining Encompasses But Not Limited To Approximately 3,370 Lf Of 10-12" Sanitary Sewers, Mobilization, Demobilization, Cleaning, Televising, Bypass Pumping, Traffic Control, Point Repairs, Surface Restoration, And Incidentals. This Work Shall Include All Labor, Supervision, Materials, Supplies, Transportation, Equipment, And Services Necessary And Required To Perform The Project As Set Forth In The Contract Documents. Bidder May Bid On Any Division(S) - However There Is No Requirement To Bid On All Divisions. Contractor Does Noi Have To Submit On All Divisions To Be Considered. Provided The Contractor Furnishes Proof Of Proper Insurance And Bonding In A Timely Manner, It Is Anticipated That A Notice Of Award Of Contract Will Be Issued Within 60 Days Of The Date Bids Are Opened And That A Notice To Proceed Will Be Issued Within 10 Days Of The Date Of The Notice Of Award. This Project Shall Reach Substantial Completion By December 15,2025, And Final Completion By April 15, 2026. Completion Dates And Requirements Are Further Outlined In The Agreement, Document C-520. The Designated Website Will Be Updated Periodically With Addenda, Lists Of Registered Plan Holders, Reports, And Other Information Relevant To Submitting A Bid For The Project. All Official Notifications, Addenda, And Other Bidding Documents Will Be Offered Only Through The Designated Website. Neither Owner Nor Engineer Will Be Responsible For Bidding Documents, Including Addenda, If Any, Obtained From Sources Other Than The Designated Website. Any Contract Or Contracts Awarded Under This Invitation For Bids Are Expected To Be Funded In Part Bv A Loan From The Illinois Environmental Protection Agency (Illinois Epa). Neither The State Of Illinois Nor Any Of Its Departments, Agencies, Or Employees Is Or Will Be A Party To This Invitation For Bids Or Any Resulting Contract. The Procurement Will Be Subject To Regulations Contained In The Procedures For Issuing Loans From The Water Pollution Control Loan Program (35 Iac Part 365), The Davis-bacon Act (40 Usc 276a Through 276a-5) As Defined By The United States Department Of Labor, The Employment Of Illinois Workers On Public Works Act (30 Ilcs 570), Illinois Works Jobs Program Act Apprenticeship Initiative (30 Ilcs 559/20-1), Dbe Policy Per 40 Cfr Part 33, As Amended, And The Federal "Build America, Buy America Act" Requirements As Contained In The Federal Infrastructure Investment And Jobs Act, Pub. L. No. 117-58. This Procurement Is Also Subject To The Loan Recipient S Policy Regarding The Increased Use Of Disadvantaged Business Enterprises. The Loan Recipient's Policy Requires All Bidders To Undertake Specified Affirmative Efforts At Least Sixteen (Tfi) Days Prior To Hid Opening- The Policy Is Contained In The Specifications. Bidders Are Also Required To Comply With The President's Executive Order No. 11246, As Amended. The Requirements For Bidders And Contractors Under This Order Are Explained In 41 Cfr 60-4. Advertisement For Disadvantaged Business Enterprises Must Be Advertised In Daily Regional Newspapers, Or Approved Equivalent. Bid Security A Certified Check Or Bank Draft Payable To The Order Of Village Of Atwood, Illinois, Or A Satisfactory Bid Bond Executed By The Bidder And An Acceptable Surety In An Amount Equal To Five Percent (5%) Of The Total Base Bid For The Divisions Bid Shall Be Submitted With Each Bid. Instructions To Bidders. For All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, And Contract Award, Refer To The Instructions To Bidders That Are Included In The Bidding Documents. Bid Hold Time Bids Will Be Held Good For A Period Of Ninety (90) Days Subsequent To The Opening Of Bids.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$50,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
57
Bidding Soon
775
All Active Projects
343
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 6, 2024

October 7, 2024

April 15, 2026

img_map_placeholder

To Be Determined, Atwood, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.