Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 14, 2025 at 7:00 PM
Updated February 15, 2025
Site work, paving and outdoor lighting for a mixed-use development in Santa Ana, California. Completed plans call for site work for a recreation facility; for outdoor lighting for a recreation facility; and for paving for a recreation facility.
Scope of work includes excavation, grading, removal of existing decomposed granite pathways, lighting, landscape, electrical, and installation of concrete pathways with decorative paving insets. The City Utilizes Construction Management (Cm) Software to Manage Construction Projects. The Current Software Platform is Procore. The Contractor Shall Be Required to Interface With the Cm Software for All Aspects of Construction, Including, but Not Limited to, Schedule, Submittals, Rfis, Contract Documents, Inspections, and Progress Payments. The City Will Provide the Contractor's Representatives Access to the System. Online Q&A Yes Q&A Deadline 01/08/2025 2:00 PM (PST) Contact Info CIP Engineering 714-647-5042 CIPContracts@santa-ana.org Bids to Gilbert Castillo Owner's Agent Bid Bond 10.00% Payment Bond 100% Performance Bond 100% Bid Valid Liquidated Damages $1,200 per calendar day Estimated Bid Value 490,000.00 Start/Delivery Date Summer 2025 Project Duration 50 working days A scanned copy of the Bid Proposal Guaranty shall be uploaded to PlanetBids along with project bid. Bid Proposal Guaranty shall be in the form of a cashier's or certified check payable to the City of Santa Ana, or Bid Bond issued by a corporate surety, in an amount not less than ten percent (10%) of the bid aggregate, as a guarantee that the Bidder will enter into the proposed contract if the same is awarded. The signature of the bidder on the bid bond must be notarized. Contractor Shall, After Award of This Contract, Furnish Two Bonds to Be Approved by the City, One in the Amount of One Hundred Percent (100%) of the Contract Price, to Guarantee the Faithful Performance of the Work (Performance Bond), and One in the Amount of One Hundred Percent (100%) Of the Contract Price to Guarantee Payment of All Claims for Labor and Materials Furnished (Payment Bond). This Contract Shall Not Become Effective Until Such Bonds Are Supplied to and Approved by the City.
Award
Sidewalks / Parking Lot
$388,740.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
