BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a pre-engineered storage facility in Mount Holly, New Jersey. Completed plans call for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of October 25,2024, this project has not yet been awarded. A timeline for award has not yet been established. Replacement of Salt Sheds for the County of Burlington Question Deadline 09/16/2024 at 5:00 PM ET PROJECT NAME AND LOCATION: Replacement of Four (4) Salt Sheds for the Department of Public Works 2. PROJECT SCOPE: The proposed project shall include but not be limited to the following work: o Construction of Four (4) Salt Sheds o Demolition of three (3) existing Salt Sheds o Miscellaneous site work o Miscellaneous electrical work Trades Required: o General Construction o Electrical o Structural Steel 3. PROJECT PHASING The work is to be conducted on an occupied site. All work is to be coordinated with the County so as not to interrupt daily operations. The contractor may, at their own discretion, begin work on all sheds concurrently or stagger their construction and demolition. For all locations with the exception of Bass River, ALL new sheds are to be fully constructed and CO's issued before demolition of the existing structures begins. The existing structure at Delran is to Remain. For the Bass River location, once the existing structure and brine tank supporting slab are demolished, to make way for the new structure and in-kind replacement of the brine tank support slab, the contractor shall have sixty (60) calendar days to construct and obtain a CO for the new shed. Should the contractor exceed the sixty (60) day timeline, liquidated Existing Brine Tank Slab dimensions, construction materials subbase and all items related to the anchorage and attachments of the Brine Tank to the slab shall be verified and recorded by the Contractor and reported to the Engineer upon demolition. Slab to be reconstructed, in-kind, at the location shown for the Bass River location only Location 1991 HAMMONTON ROAD SALT SHED 10 HARTFORD RD SALT SHED 1882 FLORENCE ROAD 25 PEMBERTON-BROWNS MILL ROAD SALT SHED

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$1,796,000.00

Public - County

Demolition, New Construction, Site Work

49

22

49

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
253
Bidding Soon
3,740
All Active Projects
1,687
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

December 2, 2024

img_map_placeholder

Multiple Locations, Mount Holly, NJ

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.