Site work and paving for a civil project in Victorville, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The City of Victorville is seeking qualified skilled contractors to perform sinkhole pavement repair. The sinkhole was caused by a leaking water service under the pavement on Solitude Circle in March of this year and Public Works has made a repair for the waterline. Currently, the road is paved with temporary asphalt. The City is seeking a contractor capable of completing the pavement repairs. The contract shall consist of, but not limited to, labor, materials, tools equipment and supplementary services necessary to complete the work. SCOPE OF WORK: o Excavate top 30" of existing pavement, recompact to 95% relative compaction and pave the road with 3" of AC (B-PG 64-10 R15) over 8" of Class 2 Base. (Refer to attached Plans). Subgrade shall be compacted to 90% relative compaction. o Stripping - one Stop Bar and Legend per City Standard Drawing S-31. o Traffic Control Plans and Implementation - It shall be the Contractor's responsibility to maintain the access and coordinate the work with the property owners including 13496 and 13491 Solitude Circle. o Plans attached as Exhibit FOR QUESTIONS: Celeste Calderon, Finance Specialist Phone: (760) 955-5082, Fax: (760) 269-0045, e-mail: cmcalderon@victorvilleca.gov LIQUIDATED DAMAGES: The Contractor shall pay SCLAA the sum of $1,000.00 per day for each and every calendar day delay in finishing the work as outlined in the Scope in excess of the FIFTEEN (15) WORKING DAYS specified below as Liquidated Damages. The SCLAA withholds liquidated damages before the accrual date if the anticipated liquidated damages may exceed the value of the remaining work. BEGINNING OF WORK AND TIME OF COMPLETION: The work under this contract shall be diligently prosecuted to completion before expiration of Fifteen (15) WORKING DAYS beginning on the date specified in the Notice to Proceed. GUARANTY AND BONDS: A material and workmanship guaranty for a period of twelve (12) months from the date of acceptance of the work shall be required. For projects over $25,000.00 (including labor and materials), the Contractor, simultaneously with execution of the Contract, shall furnish a surety bond in an amount equal to one hundred percent (100%), of the contract price as security for the faithful performance of the Contract, and a separate surety bond in an amount equal to one hundred percent (100%) of the contract price as security for the payment of all persons performing labor and furnishing materials in connection with the Contract.

Award

Roads / Highways

$87,000.00

Public - City

Paving, Site Work

3

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
234
Bidding Soon
3,492
All Active Projects
1,549
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 8, 2024

September 9, 2024

img_map_placeholder

Solitude Cir, Victorville, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.