BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a military facility in Vandenberg AFB, California. Working plans call for the renovation of a military facility.

Cancellation Description Mistaken duplicate posting.Please refer to Notice ID 24-2212 for this effort Request for Qualification (RFQ) for Architectural and Engineering Services, Vandenberg Space Force Base, California Project: XUMU 242212 Concept Design: Delta 8 Secure Renovation, B12006 (Design) Vandenberg Space Force Base (VSFB) has a need for Architectural and Engineering (AE) services to produce a Conceptual Design/35% Design in accordance with Department of the Air Force Instruction (DAFI) 32-1020, Planning and Programming Built Infrastructure Projects, and with the 30th Civil Engineer Squadron (30 CES) in developing an engineering design for the secure renovation of building 12006 in multiple rooms at Vandenberg Space Force Base (VSFB). The AE firm shall research the current situation and provide an engineering solution in accordance with the attached Statement of Work (SOW) and all applicable attachments, codes, standards, laws, and regulations, that pertain to this project. The selection of a firm for this effort is being conducted under FAR 36.602 procedures. This Request for Qualifications (RFQ) shall not be mistaken for a Request for Proposal. Please refer to the attachment titled 242212_RFQ_20240816 for the Request for Qualifications instructions. Only responses adhering to the RFQ guidelines will be considered. The 30th Contracting Squadron (30 CONS) intends to issue a Request for Proposal (RFP) after evaluation of RFQ responses to one (1) AE firm for project XUMU 242212, Delta 8 Secure Renovation, B12006 (Design), on or about 26 Oct 2024. The award is contemplated as a Total Small Business Set-Aside. The contract will be a negotiated, firm-fixed-price contract. The following North American Industry Classification System (NAICS) code applies to this RFQ: 541330, Engineering Services. The size standard for this NAICS code is $25.5M. Drawings, cost estimates, specifications, calculations, and all other deliverables required under this acquisition shall be completed within 274 calendar days after date of Award, unless otherwise agreed upon with the Government project manager and contracting officer. All respondents are advised that in accordance with 10 U.S.C. 7540, 8612, and 9540, the contract price for the preparation of designs, plans, drawings, and specifications shall not exceed ten (10) percent of the project's estimated construction cost. Design limitation costs will be provided to the most highly rated AE firm selected to complete the design. The estimated magnitude for construction (not design) of this project is between $5,000,000.00 and $10,000,000.00. This acquisition will be procured pursuant to the requirements in Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation and FAR Part 36, Construction and Architect - Engineer Contracts. All potential respondents are reminded that in accordance with FAR 52.204-7, System for Award Management (SAM), lack of registration in the SAM will make a respondent ineligible for contract award. Notice to potential respondent(s): Funds are not presently available for this effort. No award will be made for this effort until funds are available. The Government reserves the right to cancel this acquisition, either before or after the deadline for receipt of SF330s. In the event the Government cancels this acquisition, the Government has no obligation to reimburse a respondent of any cost. Questions and Answers: Questions regarding this post are due no later than 29 August 2024 at 3:00PM PDT, responses to all questions received will be added to the SAM.gov post on or about 5 September 2024. Only questions related to the RFQ and project requirements will be addressed, questions regarding details of the resulting RFP will not be answered. RFQ Response Due Date: Responses to this RFQ are due no later than 16 September 2024 by 3:00PM PDT. Late responses will not be considered for further elevation. NOTE: It is the responsibility of all potential respondents to monitor these sites for release of any future notices and/or release of amendments. General inquiries regarding this notice may be emailed to the team email address at 242212Delta8SecureRenovationB12006@groups.af.mil. Please note that due to increased firewall protections, some emails may be blocked; therefore, a follow-up via telephone at 805-606-2164 (if an acknowledgement is not received via email) is strongly recommended to ensure receipt of your submission by the Government. The Method of Contractor Selection has not been determined at this Time.

Final Planning

Military

$250,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
7
Bidding Soon
203
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

img_map_placeholder

747 Nebraska Ave, Vandenberg AFB, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.