BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

Demolition, site work, paving and new construction of a civil project in Custer, Montana. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Description This agreement covers services for the initial design only for the Bighorn River - 1M W Bighorn project, which will include all work necessary through approval of the Scope of Work (SOW) report. If Design-Build is determined to be the appropriate delivery method, the selected consultant will be precluded from participating as part of any Design-Build team proposing for the Phase 2 effort. The project will replace/rehabilitate a pair of existing structures on I-94. The first of these facilities is an Eastbound Structure (ID 01920) and the other being a Westbound Structure (ID 01921), both are in fair condition. The Eastbound structure is narrow and scour susceptible causing replacement to be the appropriate scope. The Westbound structure will be rehabilitated. The project will potentially include (but is not limited to) roadway design; traffic engineering, operations analysis and design; geotechnical investigation, analysis, and design; survey (control survey, mapping and engineering survey); environmental evaluation and permitting; bridge design; hydraulics analysis and design; local agency and other stakeholder coordination. March 2, 2026: Proposals reviewed, rated, and ranked by the evaluation committee March 4, 2026: Consultant Selection Board meeting to select consultant April 1, 2026: Scoping meeting with selected consultant If you have any questions, please contact me at (406) 444-7964, or by email at kwilliams@mt.gov. I look forward to receiving your proposal. The method of Contractor Selection has not been Determined at this time. MT DOT - RFP Engineering - Bighorn River - 1M W Bighorn

Conceptual

Roads / Highways

$1,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
1
Bidding Soon
66
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2027

Project location map

I-94, Custer, MT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.