Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2026 at 8:00 PM
Updated April 4, 2026
Demolition, site work, paving and new construction of a civil project in Custer, Montana. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Description This agreement covers services for the initial design only for the Bighorn River - 1M W Bighorn project, which will include all work necessary through approval of the Scope of Work (SOW) report. If Design-Build is determined to be the appropriate delivery method, the selected consultant will be precluded from participating as part of any Design-Build team proposing for the Phase 2 effort. The project will replace/rehabilitate a pair of existing structures on I-94. The first of these facilities is an Eastbound Structure (ID 01920) and the other being a Westbound Structure (ID 01921), both are in fair condition. The Eastbound structure is narrow and scour susceptible causing replacement to be the appropriate scope. The Westbound structure will be rehabilitated. The project will potentially include (but is not limited to) roadway design; traffic engineering, operations analysis and design; geotechnical investigation, analysis, and design; survey (control survey, mapping and engineering survey); environmental evaluation and permitting; bridge design; hydraulics analysis and design; local agency and other stakeholder coordination. March 2, 2026: Proposals reviewed, rated, and ranked by the evaluation committee March 4, 2026: Consultant Selection Board meeting to select consultant April 1, 2026: Scoping meeting with selected consultant If you have any questions, please contact me at (406) 444-7964, or by email at kwilliams@mt.gov. I look forward to receiving your proposal. The method of Contractor Selection has not been Determined at this time. MT DOT - RFP Engineering - Bighorn River - 1M W Bighorn
Conceptual
Roads / Highways
$1,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2027
I-94, Custer, MT
Related To This Project
Custer, MT
--
Custer, MT
Bid Date: Nov 10 2025
Custer, MT
Bid Date: Mar 09 2023
Custer, MT
Bid Date: Nov 10 2022
Custer, MT
Bid Date: Oct 27 2022
Bozeman, MT
--
Columbus, MT
--
Lewistown, MT
--
Luther, MT
--
Red Lodge, MT
--
Lewistown, MT
--
Laurel, MT
--
Billings, MT
--
Lewistown, MT
Bid Date: Oct 10 2024
Crow Agency, MT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
