Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 1, 2025 at 8:00 PM
Updated October 2, 2025
Site work, paving and outdoor lighting for a mixed-use development in Centralia, Washington. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.
https://www.chronline.com/stories/with-state-money-in-hand-lewis-county-commissioners-approve-road-project-priorities,381899 The resolution passed by the county commissioners provides an idea of how the county plans to allocate $10.2 million. Roughly half will fund projects starting work this summer or early next year, including widening Scheuber Road North from Mt. Vista Road to Galvin Road and safety and traffic control improvements to parts of Harrison Avenue. Other sums will go toward planning, design and acquiring land needed for future projects. The construction this summer on Scheuber Road North is one of the first projects associated with the North Lewis County Industrial Access Plan to break ground. That plan is the culmination of years of funding from the Legislature and multiple studies conducted by the Washington State Department of Transportation analyzing how to improve traffic conditions in the Centralia area, especially near the Interstate 5 interchange, and how to separate industrial traffic from everyday commuter traffic. The plan lays out possible improvements throughout Centralia, including to Harrison Avenue, Reynolds Avenue and Scheuber Road North along with other smaller improvements around the city. ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Reconstruction of N. Scheuber Road to include roadway widening, utility improvements, addition of sidewalk and bicycle lanes, street lighting, intersection improvements, roadway delineation and permanent signs County: Lewis Agency: Centralia Length : 0.700 Begin Termini : Galvin Road End Termini : Borst Avenue As of October 1 , 2025, the project is in Final Planning status. Anticipated letting Year is 2025. WADOT - Westside Connector Phase 1 - North Scheuber Rd Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Roads / Highways
$2,500,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
S Scheuber Rd, Centralia, WA
Related To This Project
Centralia, WA
--
Centralia, WA
--
Centralia, WA
Bid Date: Aug 19 2024
Centralia, WA
Bid Date: Aug 20 2025
Centralia, WA
--
Centralia, WA
Bid Date: Oct 29 2024
Centralia, WA
--
Centralia, WA
Bid Date: Dec 19 2024
Centralia, WA
--
Centralia, WA
Bid Date: Aug 22 2024
Centralia, WA
Bid Date: Jul 31 2024
Centralia, WA
Bid Date: Jun 25 2024
Centralia, WA
Bid Date: Jun 12 2024
Centralia, WA
Bid Date: Jun 06 2024
Centralia, WA
Bid Date: Jun 04 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
