BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Site work, paving and outdoor lighting for a mixed-use development in Centralia, Washington. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

https://www.chronline.com/stories/with-state-money-in-hand-lewis-county-commissioners-approve-road-project-priorities,381899 The resolution passed by the county commissioners provides an idea of how the county plans to allocate $10.2 million. Roughly half will fund projects starting work this summer or early next year, including widening Scheuber Road North from Mt. Vista Road to Galvin Road and safety and traffic control improvements to parts of Harrison Avenue. Other sums will go toward planning, design and acquiring land needed for future projects. The construction this summer on Scheuber Road North is one of the first projects associated with the North Lewis County Industrial Access Plan to break ground. That plan is the culmination of years of funding from the Legislature and multiple studies conducted by the Washington State Department of Transportation analyzing how to improve traffic conditions in the Centralia area, especially near the Interstate 5 interchange, and how to separate industrial traffic from everyday commuter traffic. The plan lays out possible improvements throughout Centralia, including to Harrison Avenue, Reynolds Avenue and Scheuber Road North along with other smaller improvements around the city. ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Reconstruction of N. Scheuber Road to include roadway widening, utility improvements, addition of sidewalk and bicycle lanes, street lighting, intersection improvements, roadway delineation and permanent signs County: Lewis Agency: Centralia Length : 0.700 Begin Termini : Galvin Road End Termini : Borst Avenue As of October 1 , 2025, the project is in Final Planning status. Anticipated letting Year is 2025. WADOT - Westside Connector Phase 1 - North Scheuber Rd Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$2,500,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
76
Bidding Soon
1,476
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

Project location map

S Scheuber Rd, Centralia, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.