BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Concord, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Sun Terrace Elementary School Crossing Enhancements Project As a condition precedent to the completion of this contract, the Contractor shall furnish a Defective Material and Workmanship Bond, from a surety company acceptable to the Engineer and payable to the City of Concord, in a sum not less than ten (10) percent of the total final construction contract price. The scope of work is generally for constructing curb ramps and improving crossing at two intersections at Cardinal Drive and Falcon Drive on Floyd Lane in the City of Concord. Works shall include traffic control, pedestrian detours, staging of work, water pollution control program, clearing and grubbing, curb and gutter, sidewalk, asphalt concrete removal, hot mix asphalt, pavement marking removal and installation, delineators, and such other items or details that are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer. The Engineer's estimated construction is approximately $125,000 to $175,000 for the base bid. The Engineer's estimated construction is approximately $125,000 to $175,000 for the base bid. The Contractor shall possess at least one of the following valid Contractor's licenses at the time the bids are opened: Class "A": General Engineering Contractor, or; Class "C-8": Concrete Contractor. The Contractor shall have completed within the last five years a minimum of three Capital Improvement Program (CIP) projects for one or more public agencies; these projects shall involve work of similar type and complexity, each project valued at not less than $150,000.00. Labor Compliance Requirements (Prevailing Wage, SB854 Etc.). Contractor/Vendor must comply with all labor compliance requirements including but not limited to prevailing wage requirements, SB 854, Labor Code sections 1771.1(a) & 1725.5, Public Works Contractor Registration Program, Electronic Certified Payroll Records to Labor Commissioner, and other requirements described on the direct links provided in the document 'Labor Compliance Requirements (Prevailing Wages, SB 854 Etc.', posted on the City Purchasing's website. The City has ascertained that Federal Wage Rates or State of California prevailing wage rates are applicable for this project. The federal wage rates are listed in the appendices of the special provisions. All Bids Shall Be Presented Under Sealed Cover and Shall Be Accompanied by Cash, Cashier's or Certified Check or a Bidder's Bond Executed by a Corporate Surety Insurer. The Bidder's Guarantee Shall Be in an Amount Equal to at Least Ten Percent (10%) of the Amount Bid and Made Payable to the City of Concord. The Contractor may elect to receive 100% of payments due under the contract from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code and with applicable City regulations. Such securities, if deposited by the Contractor, will be valued by the City's Finance Director, whose decision on valuation of the securities will be final *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF WORK The provisions of Section 4, "Scope of Work," of the Standard Specifications shall apply in their entirety unless modified or supplemented herein. Project No. 2712 - Sun Terrace Elementary School Crossing Enhancements The scope of work is generally for constructing curb ramps and improving crossings at two intersections at Cardinal Drive and Falcon Drive on Floyd Lane in the City of Concord. Work shall include traffic control, pedestrian detours, staging of the work, storm water pollution control program, clearing and grubbing, curb and gutter, sidewalk, asphalt concrete removal, hot mix asphalt, pavement marking removal and installation, delineators; and such other items or details that are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer. Question Deadline 08/13/2024 at 12:00 PM PT

Bid Results

Roads / Highways

$230,605.00

Public - City

Paving, Site Work

8

5

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
53
Bidding Soon
1,855
All Active Projects
790
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 23, 2024

img_map_placeholder

Floyd Ln, Concord, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.