BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a pre-engineered storage facility in Blythewood, South Carolina. Completed plans call for the renovation of a pre-engineered storage facility.

Award: QED Inc for $29,452.50 Bids from qualified contractors to perform the mechanical assembly and electrical installation of the Cumberland shredder, grinder, conveyor, and blower/cyclone system in the SCDMV Warehouse. Question Deadline 08/14/2024 at 5:00 PM ET SEDONA.SCHUEHLE@SCDMV.NET Scope South Carolina Department of Motor Vehicles (SCDMV) is seeking bids from qualified contractors to perform the mechanical assembly and electrical installation of the Cumberland Shredder, grinder, conveyor, and blower/cyclone system at the SCDMV warehouse. B. Equipment Serial and Model Numbers 1. Granulator: SN - CA093600A-18007. MN - 1218X a. Granulator operates on a 480V Three-Phase electrical system. 2. Shredder: SN - 180601-01. MN - MS2260 a. Shredder operates on a 480V Three-Phase electrical system. 3. Shredder Control Panel a. Shredder control panel operates on a 480V Three-Phase electrical system. 4. Baldor Reliance Super "E" Motor, Blower Motor: SN - 92384. MN - 4002FD a. Baldor Reliance Super "E" Motor, Blower Motor operates on a 230 or 460V Three-Phase electrical system. C. SCDMV Responsibilities: 1. SCDMV shall provide 5K forklift and operator to move above equipment necessary for Contractor to complete the installation. 2. SCDMV shall provide two (2) service disconnects no higher than 60" from floor. a. One (1) 600V three phase 100Amp fused service disconnect (Shredder/control panel) within 20' of control panel. b. One (1) 600V three-phase 30amp fused service disconnect (Grinder) within 30' of grinder. D. Contractor Responsibilities 1. Contractor shall assemble the SCDMV-supplied cyclone stand, including all necessary welding. 2. Contractor shall direct the SCDMV forklift operator in placement the SCDMV-supplied shredder, grinder, cyclone, filter head, blower, and conveyor. 3. Contractor shall complete assembly and setup, including the mechanical and electrical termination of the shredder, grinder, conveyor, and blower/cyclone system. 4. Contractor shall provide six (6) 5/8"-11 x 3" bolts, washers, and nuts for risers. 5. Contractor shall base placement of the SCDMV-supplied shredder, grinder, cyclone, filter head, blower, and conveyor system on SCDMV-supplied original equipment manufacturer drawings and SCDMV floor markings, provided to Contractor by SCDMV after award. 6. Contractor must complete the mechanical installation of the piping, bends, couplings, and other components supplied by the SCDMV. 7. Contractor must terminate control and power cables from the equipment to the shredder control panel. 8. Contractor shall fuse the 600V three phase 100Amp fused service disconnect (Shredder/control panel) at 60 Amps with a Time Delay fuse. 9. Contractor shall fuse the 600V three-phase 30amp fused service disconnect (Grinder) at 20 Amps with a Time Delay fuse. 10. Contractor shall consult with Cumberland support whenever necessary for troubleshooting purposes and to ensure the accurate and complete execution of the project. 11. The Contractor must test and make proper adjustments upon assembly to ensure the equipment functions properly. 12. Contractor staff must sign and submit SCDMV AD-503B (Contract Personnel Acknowledgment of Non-Disclosure and Due Diligence; see Attachment A) to the Procurement Officer prior to commencement of work.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$29,452.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
135
Bidding Soon
1,648
All Active Projects
745
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 6, 2024

September 30, 2024

img_map_placeholder

10311 Wilson Blvd, Blythewood, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.