BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 10, 2024 at 8:00 PM

Updated October 11, 2024

Site work and paving for a mixed-use development in Highland Park, Illinois. Completed plans call for site work for a golf course; road / highway; and for paving for a road / highway.

The Park District of Highland Park is seeking sealed bids for the following scope of work: asphalt removal and replacement of cart paths on Holes 15, 16, 17, & 18 at Sunset Valley Golf Club (1390 Sunset Road, Highland Park, IL). The scope of work includes all necessary workmanship to satisfactorily complete the work as required by the contract documents. Work will start Monday, October 7, and conclude by Friday, November 8, 2024. Contractors bidding on the project must have a minimum of 5 years of experience in the work or similar. The Park Board of the Park District of Highland Park reserves the right to reject any or all bids in full or in part, if it shall deem it in the public interest to do so. In submitting a bid, Contractor acknowledges that Contractor must comply with all requirements of the Illinois Prevailing Wage Act and all other applicable Illinois laws. PARK DISTRICT OF HIGHLAND PARK /s/ Brian Romes Secretary of the Board of Park Commissioners Sunset Valley Golf Club, 1390 Sunset Road, Highland Park, Il. (Holes 15,16,17 &18) o Grind (Removal) 2" of designated cart path sections per construction drawings o Installation of 2" asphalt overlayment (includes 1" binder course and 1" surface course) o Installation of new cart paths to include excavation, installation of stone base, and asphalt binder and surface courses o Turf restoration including topsoil, seed, and peat moss The Alternate Bid Scope of Work includes: Sunset Valley Golf Club, 1390 Sunset Road, Highland Park, Il. (Hole 18 - Section 5) o Grind (Removal) 2" of section 5 area per construction drawings o Installation of 2" asphalt overlayment (includes 1" binder course and 1" surface course) o Turf restoration including topsoil, seed, and peat mass

Bid Results

Golf Course

$185,000.00

Public - City

Paving, Site Work

7

8

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Resurfacing of Precast Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
111
Bidding Soon
2,177
All Active Projects
840
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

October 7, 2024

img_map_placeholder

1390 Sunset Rd, Highland Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.