BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Baton Rouge, Louisiana. Completed plans call for the renovation of a educational facility.

: Roof Replacement The successful Bidder is allowed One-Hundred Twenty (120) calendar days to complete the Project from the commencement date stated in the Agreement or a Notice to Proceed. Liquidated damages will be assessed at $1,000.00 for each consecutive calendar day for which the work is not substantially complete and $1,000.00 for each consecutive calendar day beginning the 46th day after the date of Substantial Completion for which all of the work listed on the punch list is not complete. East Baton Rouge Parish School Board reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or reject any or all bids and to waive technicalities and informalities as allowed by law. The East Baton Rouge Parish School Board has adopted a Fair Share Procurement Policy with a goal of at least twenty (20%) percent participation by MWBEs. The policy and goal apply to this project. WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: 1. This scope will consist of the demolition of the existing roofing system over Buildings A, A1, B, and E of Delmont Pre-K Center. This scope of work shall also include all necessary removal and / or replacement of existing Mechanical and Electrical equipment in order to replace the roofing system. 2. Scope includes any other Work indicated in the Contract Documents. B. Type of Contract: 1. Project will be constructed under a single prime contract. 1.5 OWNER FURNISHED PRODUCTS A. None. 1.6 ACCESS TO SITE A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project. B. Condition of Existing Grounds: The contractor will be allowed to store materials on the campus site. The site is large. The contractor shall clearly identify the area needed for construction parking and staging and shall keep within these limits. The school board will maintain the grounds beyond their boundaries. The contractor shall maintain the grounds within his boundaries. Question Deadline 08/13/2024

Bid Results

Educational

$535,000.00

Public - County

Renovation

22

16

2

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
29
Bidding Soon
525
All Active Projects
198
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 23, 2024

img_map_placeholder

5300 Douglas Ave, Baton Rouge, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.