BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2024 at 8:00 PM

Updated September 14, 2024

Site work, paving and renovation of a municipal facility in Broken Arrow, Oklahoma. Completed plans call for the renovation of a municipal facility; for site work for a municipal facility; and for paving for a municipal facility.

Project was awarded to Ascend Commercial Builders in the amount of $1,700,314.98. This project is to renovate the Public Works Field Office located at 2300 S 1st Place, Broken Arrow, OK 74012. It will include a base bid and three alternates. The base bid includes renovations to the east portion of an existing steel frame building. The administration building includes all new interior walls and finishes, new mechanical and electrical systems, and a revised entrance. The office consists of open office space, conference rooms, a laboratory, and supporting spaces. The roof is to be replaced for the east administration building and the connecting west warehouse. The asphalt parking at the east administration building is to receive crack sealant, fog seal, and new striping per plans. Alternate 1 is for a Thin Brick Panel system over existing concrete base and at entrance per elevations. Alternate 2 is to replace all MSR wall panels at Field Office. And Alternate 3 is to add a fume hood (infrastructure for fume hood to remain in base bid).

Award

Municipal

$1,700,315.00

Public - City

Paving, Renovation, Site Work

64

22

21

8

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
75
Bidding Soon
1,041
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

October 21, 2024

Project location map

2300 S 1st Pl, Broken Arrow, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.