Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a municipal facility in North Weyburn, Saskatchewan. Completed plans call for site work for a municipal facility.
The City of Weyburn ("the City", "Weyburn") is seeking proposals for the provision of services to construct Stage 1 of its Landfill Expansion, complete with a waste cell, a leachate pond, a sub-drainage storage pond, temporary and permanent perimeter berms, access road, and leachate collection system. The Expansion is located on the southside of its Existing Cell at its Waste Disposal Ground (WDG). The WDG is located at SW & SE 1/4 16-08-14-W2M, ~1 km south of Weyburn, Saskatchewan and hereafter referred to as "the Site" or "WDG." The WDG includes, the Existing Cell, a scale house, an equipment garage, Eco Centre, Burn Pit, Recycling Area (Z-Wall), Metal Recycling Area, Compost Piles, Asphalt and Concrete Areas, and a Cover Soil Stockpile. The proposed Stage 1 is located at southwest of the Existing Cell within an unused area of undeveloped land and old recycling concrete area. The Leachate Pond and Sub-drainage Storage are located at northwest of the Existing Cell, and within the footprint of the undeveloped area. The City plans to build Stage 1 Cell in 2024 and the other facilities in 2025. Please provide a separated quote to complete the scope of work for 2024 and a separated quote to complete the scope of work for 2025. The scope of work will include provision of labour, materials and equipment to complete the work and not limited to the following tasks: 1. Site Preparation: includes waste removal (cutting and grading to create the northern side slope of 3.5H:1V for Stage 1), topsoil stripping, subgrade preparation, grading, compaction, and temporary storm water management. 2. Access Roads Construction: includes clearing and grabbing, topsoil removal, excavation to subgrade, construction of base and sub-base, the crowning of the road and construction of side ditches as per the design drawings and specifications. 3. Borrow Materials: Excavation of Borrow Materials, including bottom barrier clay for Stage 1 and the leachate pond clay subgrade, and berms. 4. Construction of the Landfill Expansion Cell (Stage 1): includes liner (clay bottom barrier, geosynthetic clay liner (GCL), geomembrane (GM), and geotextile, the Leachate Collection System and perimeter berms. 5. Construction of the Leachate Pond: includes excavation to subgrade, installation of Planar Drainage Geocomposite (DrainTubes), construction of the gas vents, in-situ clay compaction, geomembrane installation, tie-ins to leachate outlets, leak detection sump, berms, gates, and fence. 6. Construction of the Sub-drainage Storage: includes excavation to the designed elevation of the bottom, grading and compaction of the base, groundwater pipe collection system tie-in, To spread the upfront capital cost, Stage 1 and the Leachate Pond will be built over a two-year period in 2024 and 2025, respectively. Inquiries for this project are to be directed to: ECO Engineering Ltd. 302 Marcotte Crescent, Saskatoon SK (306) 280-0514 Attn: Mr. Lotfollah Haji, M.Eng., P.Eng. lhaji@eco-eng.ca Documents are available at https://weyburn.bidsandtenders.ca/
Post-Bid
Municipal
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2024
September 15, 2024
2 22 Ave SE, North Weyburn, SK
Related To This Project
North Weyburn, SK
Bid Date: Sep 13 2024
North Weyburn, SK
Bid Date: Jul 10 2024
North Weyburn, SK
Bid Date: May 30 2024
North Weyburn, SK
Bid Date: Apr 01 2021
North Weyburn, SK
Bid Date: Jan 11 2022
North Weyburn, SK
--
North Weyburn, SK
Bid Date: May 03 2023
North Weyburn, SK
Bid Date: Mar 03 2022
North Weyburn, SK
--
North Weyburn, SK
--
North Weyburn, SK
--
North Weyburn, SK
Bid Date: Apr 19 2022
Regina, SK
Bid Date: Aug 14 2024
Lanigan, SK
--
Saskatoon, SK
Bid Date: Aug 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.