BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Braggs, Oklahoma. Completed plans call for site work for a water / sewer project.

**Just a reminder that it is highly encouraged to visit the site prior to bidding the project to see location, access, existing conditions, etc.** Greenleaf Dam Repair and Modernization - Phase 3 - South Access Road (located at Greenleaf Dam, Braggs, Oklahoma) The following bid packages are part of this phase of bidding: - South Road Rehabilitation with an estimated value $1,400,000.00 **Do not submit bids through Online. This is a public project and bids will need to be submitted in a sealed envelope as directed** A Bid Security, as stipulated in the bid documents, in the amount of 5% of the bid shall accompany the sealed proposal of each bidder if the amount of the bid exceeds $50,000. 1.) Contractor is to furnish manpower, materials, and equipment necessary, as required by the project schedule, including interim milestone dates, and to furnish additional crews, equipment, etc. and/or overtime required to maintain the schedule if Contractor falls behind due to their own fault or due to inclement weather. 2.) Contractor is responsible for field engineering, layout and field layout from benchmarks and base building control furnished by the Construction Manager. The Construction Manager shall provide one horizontal and one vertical control point and transfer of this point is the responsibility of the contractor. Rough-In requirements are to be dimensioned off of column lines as shown on the contract documents. 3.) Contractor shall furnish hoisting, material transport, and all material handling for the scope of this bid package. 4.) Contractor shall furnish pumping and dewatering as required for the scope of this bid package. Any performed must be done so as not to hinder any other trades work. 5.) Contractor will perform any saw cutting, patching, and removal of debris as required for the scope of this bid package. The Construction Manager must approve the quality of any cutting and patching work. 6.) Contractor shall furnish drinking water for its employees and its subcontractorsí employees for the scope of this bid package. Please contact Lance Lewis with Flintco at lelewis@flintco.com with any questions about bid procedures or documents.

Post-Bid

Water / Sewer

$1,400,000.00

Public - State/Provincial

Site Work

13

13

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
40
Bidding Soon
711
All Active Projects
268
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

October 14, 2024

img_map_placeholder

To Be Determined, Braggs, OK


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.