BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Oneill, Nebraska. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This work shall consist of constructing the diversion channel and access crossing as shown in the plans. The Contractor has the option of not constructing the access crossing, in which case the item "Access Crossing" will be compensation for diverting the channel as shown. The location and size of the diversion channel shown has been approved by the Corps. Any significant deviation to the location or structures shown must be submitted to the Engineer for approval prior to construction. Any deviation will not be paid for directly, but shall be included in the item "Access Crossing". The Contractor must submit a price for this item. If their intention is to not construct a crossing or diversion, they may bid $0.00 as the unit price. Should they include a price of $0.00 and are required during construction to provide a diversion channel or construct an access crossing due to a site inspection by a permitting agency, no compensation will be allowed for that work. The projects are located: C-45(449) - on 509 Avenue between 847 Road and 848 Road in Holt County, Nebraska, C-36(131) - on 473 Avenue between 842 Road and 843 Road in Garfield County, Nebraska and C-58(42) - on 842 Road between 448 Avenue and Highway 183 in Loup County, Nebraska. The project is referred to as "STWD-CBMP(7): C-45(449), C36(131) & C-58(42)" and shall include all labor, materials, transportation and equipment required for the construction of: C-45(449) - three span 91'-9" concrete slab bridge on a 0 degree skew with a 28' clear roadway, C-36(131) - two span 50'-6" concrete slab bridge on a 30 degree (lhb) skew with a 28' clear roadway and C-58(42) - three span 91'-8" concrete slab bridge on a 20 degree (rhb) skew with a 28' clear roadway channel shaping, roadway grading and other related incidental work. Along with its Bid Proposal, each bidder shall submit an unconditional Bid Bond or Certified Check made payable to the County Treasurer of Holt County, Nebraska, in an amount equal to five (5) percent of the Bid Proposal. Also, each bidder is to include an estimated time of beginning and completion for the projects with its Bid Proposal. The desired completion date is June 1, 2025. The successful bidder (i.e. Contractor) will be allowed seventy (70) calendar days for completion of each site after beginning work at that site provided they do not exceed their specified completion date for each site. Additional days, due to poor weather conditions, may be granted at the discretion of the Engineer. No project can be started without the intent to complete that site without delay from the other sites, therefore, the Contractor will not be allowed to start the removals at a site unless they have committed a crew to complete the work at that site. Within ten (10) days following the award of the Contract, the successful bidder shall furnish a surety bond or bonds in an amount equal to or greater than the full amount of the contract. The surety and form of the bonds are subject to acceptance by the Holt County Board of Supervisors. Holt County, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Dept of Transportation, Subtitle A, Office of Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Dept of Transportation issued pursuant to such Act, hereby notifies all bidden that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin, sex, age and disability/handicap in consideration for award. The Holt County Board of Supervisors reserves the right to reject any and all bids or to waive any irregularities in bids received. Award of the Contract will be in accordance with the County Purchasing Act's competitive bidding considerations as set forth in Neb.Rev.Stat. 23-3110 to 23-3114. Holt County is an Equal Opportunity Employer.

Post-Bid

Bridges / Tunnels

$400,000.00

Public - County

New Construction, Paving, Site Work

52

5

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
65
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

September 16, 2024

img_map_placeholder

Multiple Locations, Oneill, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.