Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 15, 2025 at 8:00 PM
Updated May 16, 2025
Site work for a water / sewer project in Annapolis, Maryland. Design plans call for site work for a water / sewer project.
This is a multi-faceted project that will revitalize the City Dock area while enhancing resilience by eliminating tidal flooding and protecting against flooding caused by tropical storms and hurricanes. City Dock amenities will include: 1. Reduction of the heat island effect by adding tree canopy shading and public splash fountain, 2. Enlarged areas for public activities and programming at Dock Street, City Dock Park, and Susan B. Campbell Park, 3. Relocation of 120 parking spaces to new Hillman Garage. Resiliency measures include: 1. City Dock currently floods far too often, and frequency and severity to increase, leading to a requirement for a solution for the next 50 years (minimum), 2. Data suggests that elevating City Dock to 6 feet above sea level will protect against tidal flooding and minor storms, and 3. Elevation of 8 feet above sea level will protect against major storms and can be achieved through park elevation and flip up mechanical device design. The Harbormaster building will be demolished to make room for a wet well and pump station that are required to remove stormwater during a high tide event. The harbormaster, restrooms, and boater showers will be rebuilt at a different location in the park. This project is included in the city's 2025-2030 Capital Improvement Program (CIP). As of May 15, 2025, Expenditure Scheduled for Fiscal Year 2025 Budget. Information regarding design firm and general contractor has not been released. Further details regarding firm construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Water / Sewer
$63,408,811.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
Multiple Locations, Annapolis, MD
Related To This Project
Annapolis, MD
Bid Date: May 22 2025
Annapolis, MD
Bid Date: May 27 2025
Annapolis, MD
Bid Date: Jun 24 2025
Annapolis, MD
Bid Date: Jun 17 2025
Annapolis, MD
Bid Date: Jun 19 2025
Annapolis, MD
Bid Date: Jul 29 2025
Annapolis, MD
Bid Date: Sep 24 2019
Annapolis, MD
Bid Date: Aug 01 2025
Annapolis, MD
Bid Date: May 29 2025
Annapolis, MD
--
Annapolis, MD
Bid Date: May 30 2025
Annapolis, MD
Bid Date: May 30 2025
Annapolis, MD
Bid Date: May 09 2025
Annapolis, MD
Bid Date: May 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
