BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2024 at 8:00 PM

Updated August 21, 2024

Site work and paving for a road / highway in Houston, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Scope of Work of the Contract includes Paving Facilities of Ashland Street Dedication 1 and Ashland Street Dedication 2. Each Bid must be accompanied by a Bid Bond or a certified or cashier check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. Question Deadline 08/09/2024 All questions shall be submitted to the Engineer via electronically WORKSEQUENCE Within 10daysfromthe dateofthe NoticetoProceed, the Contractor shal submit a constructionschedule tothe Enginer foraproval. Theschedule shall beinthe formof a Gant Chart(barchart)and shal indicatethe order in which the work is to be performed. The sequence and interdependence of al major activities must be shown. The schedule shal bedrawn toa calendartime scale. The commencementand completiondates for each activity shal beshown, aswell as the durationincalendardays, for each activity. Thescheduleshal show notonly the activities for actualphysicalconstructionofthe project, but also the activitiessuch asthe Contractor's submittalof shopdrawings and the Enginer's review and aprovalofthe shopdrawings. Failure toinclude any element of work required tocompletethe projectwithinthe scheduled contract timeshal notrelease the Contractor fromhis obligation to complete the work in accordance with the contract documents. The Contractor shal updatethe constructionschedule monthly toreflect the progres ofthe work. The updated schedules shal besubmitted tothe Engineerfor aproval. Monthly partial payments will bedependentupon submission of an updated construction schedule satisfactory tothe Engineer. Ifthe actualprogres of the work fallsbehindthe Contractor's aproved constructionschedule, the Owner may elect todeductthe valueofworkscheduled but not completed from progresspaymentsdue. The value ofthe workwil l bedetermined from the Contractor's aproved schedule of values. Thesedeductions will continue until t

Post-Bid

Roads / Highways

$100,000.00

Public - County

Paving, Site Work

50

16

61

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
4
Bidding Soon
1,992
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.