BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Demolition, site work, renovation and addition to an educational facility in New Braunfels, Texas. Completed plans call for the addition of a 124,000-square-foot, three-story above grade educational facility; for the renovation of a educational facility; for site work for a educational facility; and for the demolition of a educational facility.

As of May 28, 2025, building permit revisions (portables) requested by the City of New Braunfels as of May 20, 2025. Schedule: Mobilization to the entire site will take place as soon as a building permit is secured from the City of New Braunfels and GMP Bid Package 1 Phase 2 Portables are fully occupied. Accommodation to be provided for a three-week moveout by NBISD prior to the start of demolition. Construction is expected to take approximately 20 months from Notice to Proceed (NTP). Phase 2A consists of the demolition of the existing Athletics Field House and the construction of a new 3-story Athletics / Classroom building. The new building ties into Phase 1, which is currently under construction by Joeris. Project Description: The project consists of the demolition of the existing Athletics Field House and the construction of a new 3-story Athletics / Classroom Building. The total enclosed building area is approximately 124,000 SF. The Scope of Work includes but is not limited to: Concrete drilled piers and slab on grade foundation, structural steel frame with composite concrete fill for the 2nd and 3rd floors, and steel framing for the roof. Exterior skin consists of limestone masonry and glass storefront on the exterior walls and SBS modified bitumen roof surface. Interior finishes and woodwork are typical for an upper-end High School. Special features include exterior decorative railings, sprayed fireproofing on the steel frame, expansion control, operable partitions, lockers, science laboratory casework, window treatment, fire sprinklers, plumbing, HVAC, electrical, structured cabling, AV systems, video surveillance, access control, fire alarm, landscape, irrigation, SWPPP, fencing, earthwork and utilities. This is the final competitive bidding process for Phase 2A. Subcontracts will be awarded based on the proposals we receive on January 28, 2025. Please be sure to send your proposal to bids@joeris.com. *Project documents have not yet been obtained to post. Please reach out to Joeris General Contractors for more information.

Post-Bid

Educational

$140,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

June 16, 2025

Project location map

2551 Loop 337, New Braunfels, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.