EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 22, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Binger, Oklahoma. Completed plans call for site work for a water / sewer project.

Each proposal shall be accompanied by an acceptable form of Proposal Guaranty in an amount equal to at least fve percent (5%) of the amount of Proposal, as guaranty that if the Proposal is accepted, the Bidder will execute the Contract and furnish the acceptable Performance Bond, Labor & Maintenance Bond, Owner's Protective Liability Policy, and Certifcates of Insurance within ffteen (15) days after the award of the contract. The time allowed for completion of this project is 30 working days. The project consists of: Replacement with Pipe Bursting of 8" Poly Pipe DR 17 or an Open Cut in Alley 8" PVC SDR 35 Pipe to serve Block 2 in Binger Oklahoma. Liquidated damages for failure to complete the project within the allotted time or authorized extensions thereof, shall be $3500.00 per working day. The Owner reserves the right to reject any or all bids, to waive any informality in the bidding, for the beneft of the Owner.

Award

Water / Sewer

$98,610.00

Public - City

Site Work

6

7

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Temporary Construction, Temporary Bridges
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Gratings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Seeding
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
36
Bidding Soon
450
All Active Projects
192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

September 19, 2024

img_map_placeholder

Main St, Binger, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sanitary Sewer Improvements to Serve Block 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.