BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Lamont, Iowa. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

https://iowadot.gov/news/2025-05-07/tell-us-what-you-think-about-proposed-bridge-replacement-iowa-187-fayette-county AMES, Iowa – May 7, 2025 – We want your thoughts regarding the proposed bridge replacement on Iowa 187 over Brush Creek in Fayette County (Event # 6566). Proposed improvements Include: Removing and replacing the existing bridge. Reconstruct approach pavement. Update guardrail to current standards. Through traffic will be maintained via an off-site detour utilizing County Roads W51 and C2W during construction. Construction is expected to start in the spring of 2027 and end in the fall of 2027. Share Your Feedback by May 19 Learn about the project and share your feedback . You will need to provide your name and zip code before viewing the information. For questions about the project or for free translation services, contact: Pete Hjelmstad, Field Services Coordinator Iowa DOT District 2 Office 428 43rd Street SW, Mason City, IA 50401 Phone: 641-423-7584 or 800-477-4368 Email: pete.hjelmstad@iowadot.us Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted. Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964 and other nondiscrimination statutes. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Iowa DOT Civil Rights at 515-239-1111 or by email at civil.rights@iowadot.us. ------------------------------------------------------------------ IA 187: Brush Creek 0.5 mi W of Co Rd W51 As of October 30 , 2025, the project is in Conceptual status. Anticipated letting Year is 2029. IADOT - Bridge New, Right of Way *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as become available.

Conceptual

Bridges / Tunnels

$1,723,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
81
Bidding Soon
957
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.